My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-144
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2023 3:24:15 PM
Creation date
8/4/2023 3:23:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/11/2023
Control Number
2023-144
Agenda Item Number
8.AD.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Work Order No.1 for West Regional Wastewater Treatment Facility Effluent Reject System
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DESCRIPTION HOURS LABOR <br />West Regional Wastewater Treatment Facility (WRWWTF) Effluent Reject System <br />Review of the existing PLC VO, location and implementation to support tw o <br />1 motor operated valves. Assuming that the valves are open/close w ith contact 10 $ 1,500.00 <br />outputs for open close, and up to 5 discrete inputs per valve. Location of any <br />120 Vac power for the control circuit. <br />2 Review the existing instrumentation to verify enough to support determining the 10 $ 1,500.00 <br />quality of the w ater and w hen to reject or use this w ater. <br />3 Assistance w ith the creation of design documents relative to the outcome of 10 $ 1,500.00 <br />the above and final control and interface w ith the plant Scada systems. <br />TOTAL 30 $ 4,500.00 <br />Quotation as of 6/7/2023 - Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.