My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-144
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2023 3:24:15 PM
Creation date
8/4/2023 3:23:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/11/2023
Control Number
2023-144
Agenda Item Number
8.AD.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Work Order No.1 for West Regional Wastewater Treatment Facility Effluent Reject System
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
submitted at the preliminary (-75%) and final (bidding) design intervals. We anticipate <br />approximately twenty (20) plan sheets will be generated as part of the design and <br />consist of the following: <br />• Cover sheet <br />• Site Plan & General Notes <br />• IPS Effluent Piping Modifications Plan & Section <br />• RIB Piping Replacement Plan & Profile (x2 sheets) <br />• RIB Splitter Box Improvements <br />• Construction Details (x2 sheets) <br />• Electrical and I&C (x12 sheets) <br />Soft -digs & Locates: Consultant will coordinate and provide up to sixteen (16) <br />subsurface investigations using soft -dig technique for anticipated underground conflicts. <br />Work will include utility designating and survey to identify horizontal location of <br />existing utilities within the proposed work area. <br />Survey: Consultant will prepare topographic survey for a portion of the WRWWTF site <br />that will be impacted by the proposed work. It is assumed all work will be constructed <br />on IRCDUS owned land. The survey scope for the plant sites consists of the following <br />items: <br />• Obtain existing elevations <br />• Location of the existing above ground structures and equipment, and soft -dig <br />locations at the site. <br />• Building slabs at all corners near the ground surface, edge of pavement, <br />sidewalks, inlets, swales, manholes inverts of sewer and drainage pipes, valve <br />boxes and top of valve nuts <br />• Ground elevations at a 20 -foot grid and within 10 feet near structures and <br />buildings. <br />• The vertical datum elevations will be referenced to NAVD 88 datum. <br />• Horizontal datum to be NAD 83/90 <br />Review comments from IRCDUS staff at the preliminary design phase will be discussed <br />at during a review meeting and considered for implementation in design documents. <br />Consultant's subconsultant, C&W Engineering Consultants (C&W), will prepare <br />electrical and instrumentation engineering design associated with the proposed <br />improvements. <br />Task 2 — Permitting <br />Consultant will prepare and submit FDEP form 62-620.910(9) Application for a Minor <br />Revision to a Wastewater Facility or Activity Permit, for existing permit FLA0041637. <br />K:\WPB_Civil\General\Black\Florida\IRCU\WRWWTF Reject Improvements\20230615 - WRWWTF Reject.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.