Laserfiche WebLink
submitted at the preliminary (-75%) and final (bidding) design intervals. We anticipate <br />approximately twenty (20) plan sheets will be generated as part of the design and <br />consist of the following: <br />• Cover sheet <br />• Site Plan & General Notes <br />• IPS Effluent Piping Modifications Plan & Section <br />• RIB Piping Replacement Plan & Profile (x2 sheets) <br />• RIB Splitter Box Improvements <br />• Construction Details (x2 sheets) <br />• Electrical and I&C (x12 sheets) <br />Soft -digs & Locates: Consultant will coordinate and provide up to sixteen (16) <br />subsurface investigations using soft -dig technique for anticipated underground conflicts. <br />Work will include utility designating and survey to identify horizontal location of <br />existing utilities within the proposed work area. <br />Survey: Consultant will prepare topographic survey for a portion of the WRWWTF site <br />that will be impacted by the proposed work. It is assumed all work will be constructed <br />on IRCDUS owned land. The survey scope for the plant sites consists of the following <br />items: <br />• Obtain existing elevations <br />• Location of the existing above ground structures and equipment, and soft -dig <br />locations at the site. <br />• Building slabs at all corners near the ground surface, edge of pavement, <br />sidewalks, inlets, swales, manholes inverts of sewer and drainage pipes, valve <br />boxes and top of valve nuts <br />• Ground elevations at a 20 -foot grid and within 10 feet near structures and <br />buildings. <br />• The vertical datum elevations will be referenced to NAVD 88 datum. <br />• Horizontal datum to be NAD 83/90 <br />Review comments from IRCDUS staff at the preliminary design phase will be discussed <br />at during a review meeting and considered for implementation in design documents. <br />Consultant's subconsultant, C&W Engineering Consultants (C&W), will prepare <br />electrical and instrumentation engineering design associated with the proposed <br />improvements. <br />Task 2 — Permitting <br />Consultant will prepare and submit FDEP form 62-620.910(9) Application for a Minor <br />Revision to a Wastewater Facility or Activity Permit, for existing permit FLA0041637. <br />K:\WPB_Civil\General\Black\Florida\IRCU\WRWWTF Reject Improvements\20230615 - WRWWTF Reject.doc <br />