My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-144
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2023 3:24:15 PM
Creation date
8/4/2023 3:23:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/11/2023
Control Number
2023-144
Agenda Item Number
8.AD.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Work Order No.1 for West Regional Wastewater Treatment Facility Effluent Reject System
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c. Physical Data — voltage, TDH, capacity, diameter, material, etc. <br />d. Service Data — date installed/in-service, warranty period/start date, expected <br />useful life <br />e. Financial Data — estimated installed cost (allocation of OPCC to the assets) <br />Once the Contractor considers the work to be substantially complete, Consultant will <br />attend one (1) punch list walk through with the Contractor and Owner. Consultant will <br />furnish "punch list" that identifies the remaining work to complete the project. <br />Upon completion of punch list, Consultant will perform a final site visit. Consultant <br />will review Contractor furnished closeout documentation and if applicable, make <br />recommendation for final payment and project closeout. <br />Consultant will review Contractor furnished red -lined as-builts. Consultant will utilize <br />.dwg files provided by Contractor's surveyor for preparation of record drawings. <br />Consultant will furnish final record drawing .pdf and .dwg files to IRCDUS. <br />Task 5 — WRWWTF Programming and Integration <br />See attached scope of work from Control System Design, Inc. for proposed <br />programming and integration improvements. <br />SCHEDULE <br />Consultant will provide our services as expeditiously as practicable with the following <br />goals: <br />Task 1 Design: <br />Task 2 Permitting <br />Task 3 Bidding <br />Task 4 Construction Phase Services <br />Task 5 Programming and Integration <br />4 months from NTP <br />2 months after design complete <br />3 months after permit issued <br />12 months after contract awarded <br />Concurrent to construction schedule <br />FEE SCHEDULE <br />We will provide these services in accordance with our Continuing Consulting <br />Engineering Services Agreement for Professional Services dated May 2nd, 2023, by and <br />between INDIAN RIVER COUNTY, a political subdivision of the State of Florida <br />("COUNTY") and Kimley-Horn and Associates, Inc., ("Consultant"). <br />The Consultant will provide professional services for a lump sum fee as follows: <br />Task 1: Design Phase Services $ 94,081.00 <br />Task 2: Permitting Services $ 5,977.00 <br />Task 3: Bid Phase Services $ 7,146.00 <br />Task 4: Construction Phase Services $ 34,309.00 <br />K:\WPB_Civil\General\Black\Florida\IRCU\WRWWTF Reject Improvements\20230615 - WRWWTF Reject.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.