Laserfiche WebLink
0 inframap <br />QUALITY PROFESSIONAL EXPERTISE <br />April 13, 2023 <br />Kimley-Horn <br />1920 Wekiva Way, Suite 200 <br />West Palm Beach, FL 33411 <br />Bertrand King, EI <br />E: Bertrand.King@kimley-horn.com <br />0:561-845-0665 <br />Re: West Regional Wastewater Treatment Facility (WRWWTF) Effluent Reject System <br />Vero Beach, FL <br />Subsurface Utility Engineering Services <br />Dear Mr. King: <br />We have prepared this proposal to perform subsurface utility engineering services including utility designating <br />and air vacuum excavation test holes for the above referenced project. We have received the following files <br />by emails dated April 13, 2023 attached identifying the project locations: <br />Inframap.pdf <br />Our scope of work shall be performed in accordance with the Procedures, Exclusions and Assumptions <br />identified below and will include the following: <br />1. Quality Level B - Utility Designating and Survey - Utility designating and survey will be performed to <br />provide horizontal locations of utilities within the project limits. Project limits include the area outlined <br />in red in the client provided file. <br />2. Quality Level A - Air Vacuum Excavation Test Holes - Air vacuum excavation test holes will be <br />performed at the proposed test hole locations once utility designating and potential utility conflicts <br />have been verified. This proposal includes 12 test holes at utility conflict locations. <br />Quality Level B - Utility Designating and Survey <br />Electronic Sweep/Targeting - An electronic sweep of the project site will be conducted. This sweep will <br />verify the location of utilities that were identified during record review and to search for utilities that were <br />not identified during records review. The electronic sweep will be conducted utilizing active and passive <br />type utility detection equipment that detects induced or naturally occurring energy fields present on <br />conductive utilities. Utilities identified will be marked on the ground surface using InfraMap paint and <br />symbols standards. <br />2. Field Drawings/Notes -Designators will draft field sheets that show the location, trend, and configuration <br />of utilities detected. Field sheets will be prepared to differentiate utility systems and will show underground <br />utility surface features and lines. Designated utilities will be annotated with size and material from utility <br />record information, as applicable. <br />3. Survey- A survey crew will survey utility line targeting and utility surface features. Survey of designated <br />utilities will be performed by utilizing applicable State Plane Coordinate System or client provided <br />established survey control. <br />