Mr. Himanshu H. Mehta, P.E. <br />2 June 2023 <br />Page 7 <br />Geosynte& <br />consultants <br />Phase 7 — Prepare RAPM Addendum No. 4: Under this task, supported by results from pre-RAPM <br />Addendum No. 4 injection sampling activities, Geosyntec will prepare RAPM Addendum No. 4 to <br />propose a focused injection of enhanced in situ bioremediation amendments (e.g., electron donor, <br />dechlorinating microbial cultures, and/or buffering agent) to address CVOC impacts in the vicinity of <br />the former source area (near GR-MW30B) and northwest of the former source area (near GR-MW26B). <br />Geosyntec will finalize the bioremediation design based upon the results of the investigation to <br />optimize implementation by providing both an economical and practical approach to meeting the long- <br />term goals of the Site. The draft bioremediation design package will be provided to IRC SWDD <br />electronically via email for review and comment prior to submittal to FDEP. The draft RAPM <br />Addendum No. 4 will include, at a minimum, a proposed injection location figure, dosing calculations <br />specifying the amount of bioremediation amendments required, and summary text outlining the design <br />approach. Effort is included for one round of revisions based on client comments. Within 2 weeks of <br />receiving comments from IRC SWDD on the draft RAPM Addendum No. 4, Geosyntec will submit <br />the final design package to FDEP. <br />(Note: Budget for the implementation of the bioremediation injection activities that will be proposed <br />in the RAPM has not been included and will be presented under a separate Proposal following Agency <br />approval of the RAPM Add. No. 4). <br />ASSUMPTIONS <br />The following assumptions were made in developing this fee proposal: <br />• IDW for off-site disposal (decontamination water and soil cuttings) will be characterized <br />as non -hazardous. <br />• If needed, changes to the proposed scope of work, budget or schedule will be agreed upon <br />in writing in advance of the work being performed. <br />• Adverse weather conditions that require operations to be halted may affect the proposed <br />schedule and budget. Adverse weather conditions may include, but are not limited to, a <br />tornado watch/warning, lightning in the area, and a hurricane or threat of a hurricane. <br />• If a stop work order is issued for reasons outside of Geosyntec's control, the budgeted cost <br />and schedule shall be subject to revision due to changed circumstances. <br />TIME SCHEDULE <br />The semi-annual groundwater sampling events will be tentatively conducted in June and December <br />2023 as described herein. Reports will be submitted to FDEP to meet required deadlines. RAPM <br />Addendum No. 4 monitoring well sampling activities will be conducted concurrently with the Summer <br />2023 semi-annual groundwater sampling event. DPT drilling activities will be scheduled within 90 <br />days of approval, given driller availability. The RAPM Addendum No. 4 will be submitted to FDEP <br />within 90 days of receipt of laboratory analytical results. <br />FR0766\XR23010.docx <br />engineers I scientists I innovators <br />