My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/20/2023
CBCC
>
Meetings
>
2020's
>
2023
>
06/20/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2023 10:17:51 AM
Creation date
8/11/2023 1:07:43 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/20/2023
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
620
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIRECTIONAL <br />--� DRILLING INC_ <br />ADDITIONAL COSTS: <br />A. Additional mobilization and demobilization to the site for any reason will be based on size of the HDD spread per <br />move each way (see below). <br />B. This proposal does not include any stand-by time due to delay or suspension of operations for any reason not <br />created by K3, its subs or its suppliers including, but not limited to, waiting on Owner or General Contractor to <br />complete any portion of their work or change in the site conditions. Our standby rate for our HDD Spread is <br />dependent on HDD spread (see below). If K3 loses the hole, and K3 must re -drill, it shall be treated as a new bore <br />hole and K3 will be paid the contract price for the additional work. <br />Standby/Remobilization Rates: <br />[ j D10x15 spread @ $350 per hr. up to five hours, or $2,800 per shift. Demob/Remob @ $1,800 <br />[ j D23x30 Spread @ $450 per hr. up to five hours, or $3,600 per shift. Demob/Remob @ $2,500 <br />[ ] D40x55 Spread @ $775 per hr. up to five hours, or $6,200 per shift. Demob/Remob @ $5,000 <br />[✓J D100x140 Spread @ $1,315 per hr. up to five hours, or $10,500 per shift. Demob/Remob @ $7,500 <br />[ ] D220x300 Spread @ $1,725 per hr. up to five hours, or $13,800 per shift. Demob/Remob @ $10,000 <br />GENERAL CONDITIONS & PRICING ASSUMPTIONS: <br />A. Prices include drill and pull HDD installation of the product pipe. <br />B. Post bore profiles. <br />C. K3 will be responsible for hauling off excess bentonite to contractor supplied dump site. GC is responsible for any <br />dump fees at the supplied dump site. The dump site must be located with 10 miles of job site. If dump site is more <br />than 10 miles, then additional charges apply. <br />D. GC will be responsible for acquiring all drilling water for HDD operations at the project. K3 will transport water if not <br />available at site. <br />E. Our price assumes that site conditions are conducive to horizontal directional <br />drilling and that no obstacles such as caverns, fissures, or any unknown objects such as but not limited to concrete <br />slabs, rebar, steel pilings and timber, will be encountered underground, or any situation resulting in the loss of <br />returns or loss of drilling fluids (slurry), or anything resulting in the redesign of the HDD crossing. If such conditions <br />exist, K3 reserves the right to cease operations and/or renegotiate at an equitable adjustment with the <br />Owner or General Contractor. If unable to negotiate, our standby rate plus mobilization charges will be enforced <br />until such time that operations can resume. <br />F. All efforts will be made to prevent inadvertent returns (IR). If an IR occurs, K3 will assist with clean-up services, <br />provided the IR occurs in an area accessible by semi -truck. If IR area is inaccessible, clean-up will be billed on a time <br />and material bases. <br />G. Pricing is based on 10 hour shifts up to 6 days per week and does not include costs for Inspections. <br />Contractor Initials <br />Page 2 of 3 <br />Subcontractor Initials <br />267 <br />
The URL can be used to link to this page
Your browser does not support the video tag.