My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/20/2023
CBCC
>
Meetings
>
2020's
>
2023
>
06/20/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2023 10:17:51 AM
Creation date
8/11/2023 1:07:43 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/20/2023
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
620
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K3 DIRECTIONAL <br />--- DRILLING INC. - — <br />EXCLUSIONS FROM HDD SCOPE (to be provided by others at no cost to K3 Directional Drilling, Inc.): <br />A. GC will ensure ample access to the project right-of-way and HDD drill pad. GC is responsible to protect sidewalk, <br />curb, and roadway to allow K3 to access drill pad, work area and receiving pit. Any damages by K3 accessing these <br />areas shall be repaired by GC at no cost to K3. <br />B. GC is responsible for the location of utilities or structures not located by the local one call utility locating service. <br />C. Quote does not include hazardous waste or non -hazardous contaminated soils boring. If these conditions are <br />discovered, clean-up will be billed on a time and material bases. If operations are stopped the standby rates will <br />apply. <br />D. All restoration of K3 work areas is to be completed by the Owner or GC at no cost to K3. <br />E. Permits, licenses and written permission from governmental authorities and private landowners to perform work. <br />F. All MOT/safety signage as necessary on water/land as per the D.O.T. and flagmen, if required. <br />G. GC to provide any noise mitigation requirements. <br />H. K3 will not be held responsible for costs incurred to the GC or Owner for re -drill operations including, but not limited <br />to Liquidated Damages. <br />Terms: <br />A. Proposal does not include any, use tax, sales tax, occupational tax, or any other taxes. <br />B. This quotation is subject to mutually agreeable contract terms and conditions and will not be acknowledged without <br />this proposal added as an attachment. <br />�. xJowo NO or iu SULILUIILI auorb cause dy aaniages w anyuung W1e m use PtHOI mance of iu C01ILT aCL worK, cne <br />contractor or the owner shall notify K3 (Lewis Krantz) in writing within 5 calendar days that said damages have <br />occurred. Should K3 not be notified in 5 calendar days of said damages occurrence, the contractor or the owner shall <br />assume all liability and costs of repairs. K3 shall then be given 48 hours to proceed with cure of said damages after <br />being notified in writing. <br />D. Bore Logs provided upon payment to K3. <br />E. Quote is good for 30 days and is contingent upon rig availability. <br />F. No retainage will be held from K3 by the owner or general contractor. <br />G. Net 30 days. Bills not paid in 30 days can be subject to 1.5 % per month (18% per year) service charge. <br />GC: K3 Directional Drilling, Inc. <br />By: By: <br />Printed Name: Printed Name: <br />Title: Title: <br />Date: Date: <br />Witness: Witness: <br />Printed Name: Printed Name: <br />Contractor Initials Page 3of3 Subcontractor Initials <br />268 <br />
The URL can be used to link to this page
Your browser does not support the video tag.