Laserfiche WebLink
IRCFD Station #11 Remodel Additional Services <br />Opinion of Cost <br />May 31, 2023 <br />I. Construction Costs <br />A. Remove ductwork, SAT ceiling, remove damaged drywall/dump fees $20,000 <br />B. A/C Duct replacement $75,000 <br />C. Replace/repair drywall ceiling/repaint $25,000 <br />D. Poly-Icynene roof insulation $15,000 <br />E. Re -pipe all copper water lines with polypipe/patch/drywall $20,000 <br />F. Contractor's general conditions P&OH $38,750 <br />Subtotal) $193,750 <br />II. Other Costs <br />A. Architectural / Engineering Fees <br />B. Mechanical/Electrical/Plumbing Consultant Fees <br />C. Permit Fees/Misc. <br />D. Furnishings/Equipment <br />E. Construction Contingency Recommended <br />$193,750 x 7% = <br />$13,562.50 <br />$6,000 <br />$2,500 <br />TBD <br />10% of $193,750 = <br />$19,375 <br />Subtotal III <br />$41,437.50 <br />Project Grand Total <br />$235,187.50 <br />NOTE: Opinions expressed in this report represent the professional opinion of the firm of Edlund, Dritenbas, <br />Binkley Architects and Associates, P.A. (EDB) who have used that degree of care and skill ordinarily exercised <br />under similar conditions by reputable members of our profession practicing in the some or similar locality. EDB <br />Architects, P.A. does not warrant that this opinion of probable construction cost will not varyfrom actual costs <br />incurred by the client. <br />El 1 <br />