My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-175
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-175
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2023 1:33:45 PM
Creation date
8/14/2023 1:33:00 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
06/22/1999
Control Number
1999-175
Entity Name
Geosyntec Consultants, Inc.
Subject
Professional Services Agreement with IRC SWDD for Gifford Landfill Site Investigation-
Professional Engineering Services
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GF.oSyNnx GoNs[dt.TANTs <br />Mr. Ronald. R. Brooks <br />S June 1999 <br />Page 5 <br />GeoSyntec will modify the PRAT' in accordance with direction given by IRC at the draft <br />PRAP review meeting. A second draft PRAP will be submitted for IRC's review. Only <br />minor editorial comments are anticipated (to be provided by IRC via facsimile or <br />teleconference),. <br />Task 3: Pre are PRAP for Submittal to FDEP <br />GcoSyntec will prepare five copies of the PRAP for submission to IRC for internal <br />distribution and forwarding to FDEP. GcoSyntec proposes that a meeting will be held <br />with FDEP concurrent with submittal of the PRAP. We have included budget for a 0.5 - <br />day meeting with FDEP to present the PRAP. The primary purpose of this meeting will <br />be to discuss the contents of and recommendations presented within the PRAP. Mr. <br />Chris Herin and Ms. Nandra Weeks will attend the meeting. Note: Addressing FDEP <br />comments (if any) will be handled under a separate (to be determined) budget. <br />BUDGET ESTIMATE <br />The rest estimate for preparing the PRAP as described herein is $29,716.iu, The <br />breakdown of the costs by hours and tasks is presented in the attached cost estimate <br />spreadsheet. GcoSyntec notes that cost estimates for performing work subsequent to <br />the approval of the PRAP are not included in the estimate presented above. Separate <br />cost estimates will be prepared at a later date to implement the Source Identification <br />Workplan, the pilot test program, MNA Evaluation Workplan, and any other fieldwork <br />that is warranted or necessary in IRC's efforts to address the Gifford Road Landfill site. <br />In addition, a separate cost estimate will be prepared at a inter date to prepare the RAP <br />for the site. <br />X R9Ii 070/F990270, D(7 C <br />42 - .. - - 'Y I&L <br />
The URL can be used to link to this page
Your browser does not support the video tag.