Laserfiche WebLink
of <br />i <br />ATTACHMENT B <br />SCOPE OF WORK <br />LANDFILL FINANCIAL ASSURANCE AND SURVEY SERVICES <br />RL411 <br />Indian River County currently operates a Class 1 landfill through a contract with Waste <br />Management, a Construction and Demolition (C&D) Debris Landfill facility and a Waste Tire <br />processing facility. Indian River County is required to provide financial assurance for each of <br />these facilities. <br />Task 100 - FINANCIAL ASSURANCE <br />CDM will assist Indian River County in preparing documents which demonstrate proof of <br />financial assurance for the cost of closing the Class 1 landfill, the C&D Debris Landfill and the <br />Waste Tire Processing center. CDM will also prepare an estimate of the cost of long-term care <br />for use in demonstrating proof of financial assurance. This information will be submitted to <br />Indian River County for review by the Solid Waste and Finance Department. <br />Task 200 - SURVEY <br />CDM will provide a survey and an assessment of airspace consumed for both the Class 1 landfill <br />and the C&D landfill. The survey work and volumetric modeling will be performed by Carter & <br />Associates. CDM will review the volumetric modeling and include a summary of estimated <br />waste density based on the results of the survey and volumetric modeling. <br />The survey will include a complete topographic survey of Segment II and the Infill to include the <br />surrounding ditches and entire surrounding roadways. In addition, complete a topographic <br />survey of the C&D landfill site. The survey of the C&D site is to include the fence -line and the <br />surrounding ditches and dikes that are adjacent to the C&D site. A 1" = 50' scale contour map <br />w4h nna fnna tnnr ]nte.^.raa!s, shall ,J r ,.....L duc—l_ t 1_ <br />Ori. ». ., a pr�duva u vi tea. �, Siw vii ic�liUuul IV iviylar. The flue <br />foot contour intervals are to be bold lined. <br />In addition, we will perform volumetric modeling of Segment II and the Infill, as well as, the <br />C&D site. The results shall be provided in a report that specifically identifies space consumed <br />and space remaining based on construction and design criteria. For the Class I landfill the report <br />shall include an evaluation of the compaction of the waste and an analysis as to whether Waste <br />Management is meeting its compaction requirements and contract. For the C&D site an <br />evaluation of foot print and side slopes shall be provided with an analysis as to whether the site is <br />being operated and constructed in accordance with the permitted design. The report and survey <br />is to include the dates the field survey work was completed. Ten signed and sealed copies of the <br />report shall be provided. <br />lwns,wa B-1 <br />