My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-149
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 12:39:59 PM
Creation date
8/24/2023 12:39:04 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
08/15/2023
Control Number
2023-149
Agenda Item Number
8.H.
Entity Name
Carter Associates, Inc.
Subject
Amendment 1 to Work Order 2 for Design & Engineering Services for the Public Access
Improvements on Sebastian Harbor Preserve Conservation Area
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK 6 - CONSTRUCTION SERVICES <br />• Review contractor's material submittals and scheduling. Construction inspection services will <br />be provided for the duration of construction in order to ensure that the contractor's work <br />conforms to the requirements of the project design drawings and specifications. Provide <br />certifications upon completion of construction and review of contractor provided as-builts. <br />TASK 7 — REIMBURSABLE EXPENSES <br />• Reimbursable expenses, such as postage/express mail, mileage, prints, copies, vellum, etc. <br />COMPENSATION: <br />Please find below the current billing summary for work performed to date. We recommend <br />authorization of the following amendments to the budgets for this assignment. <br />TASK <br />NO. <br />TASK <br />Contracted Items - Work Order b2 <br />Site Surveys & Soils Investigation <br />Site Plan Approval <br />Construction Plans and Specs <br />Permitting <br />Bid Documents <br />Construction Services <br />Reimbursable Expenses <br />Contract Sub -Totals <br />Permit Application Fees <br />City Land Clearing / Tree Removal <br />Totals <br />CONTRACT <br />AMOUNT <br />RILLING <br />THIS PERIOD <br />PREVIOUS <br />BILLINGS <br />TOTAL <br />BILLED <br />PERCENT <br />COMPLETE <br />BALANCE TO <br />FINISH <br />I <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />$0.00 <br />$7,900.00 <br />$0.00 <br />S7,900.00 <br />$7,%0.00 <br />100.0% <br />$7,400.00 <br />$0.00 <br />$7.400.00 <br />$7,400.00 <br />100.0% <br />$0.00 <br />$1,700.00 <br />$0.00 <br />$1,70().00 <br />$1,700.00 <br />100.0% <br />$0.00 <br />$0.00 <br />$2,900.00 <br />$0.00 <br />$2,900.00 <br />$2,900.00 <br />100.0°/. <br />$2,400.00 <br />$0.00 <br />$360.00 <br />$360.00 <br />15.0°/. <br />$2,040.00 <br />$2,100.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />0.0% <br />77.3% <br />$2,100.00 <br />$500.00 <br />$0.00 <br />$386.35 <br />$386.35 <br />$113.65 <br />$24,900.00 <br />$0.00 <br />$20,646.35 <br />$20,646.35 <br />82.9°/. <br />$4,253.65 <br />T&M <br />$0.00 <br />$125.00 <br />$125.00 <br />$0.00 <br />$20,771.35 <br />$20,771.35 <br />Additional Fees for Tasks Outlined Above: <br />Task 1 -Update Site Surveys & Soils Investigation....................................................... $+4,150.00. <br />Task 2 -Site Plan Re-Approval........................................................................................ $+8,880.00. <br />Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.