My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-166A
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-166A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2023 11:07:55 AM
Creation date
8/31/2023 11:05:46 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
08/15/2023
Control Number
2023-166A
Agenda Item Number
8.AQ.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
CCNA2018Amendment 2 to Work Order 15 for Ixora Park Sewer Rehabilitation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 3 <br />ESTIMATE FOR ENGINEERING SERVICES <br />PROJECTrXORA PARK REVISED SEWER SYSTEM REHABE2TAT10N-RECOVERY FEE AMENDMENT NO. 2 TO WO NO. IS <br />CLIENT: Indian Riva Comm UtiGtics <br />ESTIMATOR TCI <br />DESCRIPTION: <br />IXORA PA RK A M ENDMENT N0. 2 <br />DIRE -CF LABOR (MAN-HOURS) <br />TJ FHJJL NB SS MM IF <br />SEN REG PROF PROF DESIGN SIN SUPP EXP <br />PRINC PROF PROF 2 I INSP SUPP STAFF SUB <br />Da Eqt <br />4.6% <br />LINE <br />TOTAL <br />NO TASK <br />3.1 Dr—in s <br />_Design <br />Grav@l' Sewer m -Desi n (muplete to date) <br />16 0 0 551 21 0 2 <br />5615 <br />$13,989 <br />Water distribution lana co lete to date <br />12 0 0 65 24 <br />5638 <br />$14 1 <br />Road—fDraina a plans (co fete to date <br />1 1 16 1 0 1 <br />1173 <br />7 <br />0sc <br />TOTAL HOURS <br />29 0 1 136 46 0 0 3 $0.00 <br />s0 <br />S31,254 <br />LABOR S(HOUR <br />243 220 158 126 110 125 102 68 <br />$0 <br />LK <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.