Laserfiche WebLink
ORDER NO. PSC -2023 -0180 -PAA -EQ <br />DOCKET NO. 20230046 -EQ <br />PAGE 9 <br />(Continued from SheetW9.032) <br />x.9.032) <br />3;2 M 1* 00130 M. shall sbe? "po=4o W, <br />Attachment A <br />Page 4 of 42 <br />First Revised SheetNo. 9.032.1 <br />Cancels Original SheetNo. 9.032.1. <br />3.231 Design, c0nsttttct,.and mAtiinifi'd P0040tyin accordance with this Contrack applicable 1atw, regulatory; and <br />governmental approvals,; any requirements of warranty agreements or similar agreements, prudent industrypractice, <br />inswartce policies, and the Ittterootgp ctibn Agreement or Wheeling Agreement. <br />12_2 Perform all studies, payail fees; obtain all necessary approvals and execute all necessary agreements (including <br />the Interconnection Agreement or the Wheeling Agreement(s)) in order to schedule and deliver the firm capacity and <br />energy to FPL. <br />3.2.3 Obtain and maintain all permits, certifications; licenses, consents or approvals of any governmental or regulatory) <br />authority necessary for the construction, operation, and maintenance of the Facility (the "Pernuits"j. QS shall keep FPL <br />reasonably informed as to the status of its_permitting efforts and shall promptly inform FPL of any Permits it is unable to <br />obtain, that are delayed, limited, suspended, terminated, or otherwise constrained in a way that could limit, reduce, <br />interfere with, orpreclude QS's ability to perform its obligations under this Contract (including a statement of whether and <br />to what extentthisoircumstance maylimit or preclude QS7s abilityWperfort under this C':onn•act) <br />31A betnorstrate'tosa6ittet3ott: that QS' l as established Site Control, an agreement for the <br />ownership or lease of the Facility's site, for the Term of the Contract. <br />1324 Camplete all environmental impact studies and comply with applicable environmental laws necessary for the <br />06iistioptiM operation, and maintenance of the Facility, <br />32:6 At FPL's request, provide to FPL electrical specifications and design drawings pertaining to the Facility <br />for FPL's review prior to Srtalizing design of the Facility and before beginning construction work based on such <br />specifications and drawings, provided FPL's review of such specifications and design shall not be construed as endorsing <br />the specification[, and design thereoty or as any express or implied warranties including performance, safety, durability or <br />reliability of the Facility. QS shall provide to.FPL reasonable advance r"cq q(tplyc gges: tt the Fac ila trrlll pro»de to <br />FPL specifications and design drawings ofany such changes. <br />M7 'Within fifteen atter the close of each month from the first month following the Effective Date until the <br />Capacity Delivery Dat%prodife to FPL a monthly progress report (in a form reasonably satisfactory to FPL) and agree to <br />regularly scheduledeen representatives of QS and FPL to review such monthly reports and discuss QS's <br />construction progress: �, y Progress Report shall indicate whether QS is on target to meet the Capacity Delivery <br />Date. If, for any reason, FPWreason to believe that QS may fail to achieve the Capacity Delivery Date, then, upon <br />FPL's request, QS shall sttlirt f to FPL, within ten (10) business days of such request, a remedial action plan C Remedial <br />Action Plan") that sets forth a detailed description of QS's proposed course of action to promptly achieve the Capacity <br />Delivery Date; Delivery of a Remedial Action Plan does not relieve QS of its obligation to meet the Capacity Delivery <br />Date. <br /><33 MAW'have time right, but not the .obligatio% ttm', <br />3.3:2 W04Aft bosmess:hours <br />ttpon.reasoriable notice, or held'byQSi <br />.3.8;30pmistent with 'Section 3.26-notify'QS'in writing of tate results ofthereview-within thitty(3(i)dayst ag <br />"Word14 specifications for the Facility, including a description of any Haws perceived by FPL in the design; <br />3-43, lilspect the Facility's conmstnmctionj'or on <br />psc -site QS data and irt!atianpertainiitg to the Facilityd <br />'61 hbo upon notice. <br />Issued br.,X.` _ Romig,.11trector, urates and'FarlIT3 <br />Effective: September13r1016 <br />