My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/11/2023
CBCC
>
Meetings
>
2020's
>
2023
>
07/11/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2023 12:11:11 PM
Creation date
9/14/2023 10:10:27 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/11/2023
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2023 -0180 -PAA -EQ <br />DOCKET NO. 20230046 -EQ <br />PAGE 10 <br />(Continued from` <br />Sale of EnoW and Capacity byt1wQS <br />Attachment A <br />Page 5 of 42 <br />Tenth Revised Sheet No. 9.033 <br />Cancels Ninth Shect No. 9.033 <br />4.1 Consistent with the terms hereof; the QS shall sell and deliver: to FPL and'"L shall purchase and receive from the QS at the Delivery <br />Point (defined below) all of the energy and firm capacity generated by the Facility. FPL shall have the sole and exclusive right to purchase <br />all energy and capacity produced by the Facility. The purchase and sale of energy and firm capacity pursuant to this Contract shall be a ( ) <br />net billing arrangement or ( ) simultaneous purchase and sale arrangement; provided, however, that no such arrangement shall cause the QS <br />to sell more energy and firm capacity than the Facility's net output The billing methodologymay be changed at the option of the QS„ <br />subject to the provisions of FPL Rate Schedule QS -2. For purposes of this Contract, Delivery Point shall be defined as either: (a) the point: <br />of interconnection between FPL's system and the transmission system of the fmal utility transmitting energy and firm capacity from the <br />Facility to the FPL system, as specifically described in the applicable Wheeling Agreement, or (b) the point of interconnection between the:: <br />Facility and FPL's transmission system, as specifically described in the lnterconnection.Agreement. <br />4.2 The QS shall not rely, on interruptible standby service for the startup requirements (initial or otherwise). of the Facility. <br />4s3 T1te Qfi shall be responsible for all costs, charges and peitalties.assoeiated with development and ooeratiott5f lite)itttit?S!, <br />4.A The QS shall be responsible for all intMannection, electric losses, transmission and ancillary service smrangemtitrts 8�d <br />tegkedtodeliver, on a firm basis, the firm capacity and energy from the Facility to the Delivery Point <br />ColtnntlMd Capoe ty/Capgdty lleltvtaty !)cite <br />5-1 The QS comnuts to sell and BeGY $rmn'capaoity tb FPL at the Delivery Point, the amount ofwit' eh shad to detennnrnai$` ti <br />accordance with this Section 5 (the' rtmitted Capacity'). Subject to Section 5.3 the Con unfitted Capacity shall be <br />°:RW, delivery date no later than the twice date of the Avoided Unit or as otherwise specified in Appendix. E (the "Guaranteed <br />Capacity Delivery Date'). <br />53, Testing of the capacity of the :Fao t '(each such test, a "Committed Capaoity Taut")" shall be performed in accordance with fhb; <br />procedures set forth in Section 6. the Demonstration Period (defined herein) for the first Conunitted Capacity Test shall commence no <br />emriier than six (6) months prior to the Capacity Delivery Date and testing: must be completed by 11:59 p.m. EST on the date prior: <br />to the Guaranteed Delivery Date. The first Committed Capacity Test shall be deemed successfidly completed when the QS demonstrates t4 <br />FPL's satisfaction that the Facility can make availablecapacityof at least one hundred percent (10M16) of the Committed Capacity set forft <br />An Section 5.1. Subject to Section 6:1 the QS .may schedule and perform up to three. (3) Camtnitted Capacity Tests to satisfy the. <br />Capacity' requirements of the Contract. <br />5:3 FPL shall have the -right in require ft A' Iiy notice no less than ten (10),business days prior to such proposed tests to validate the: <br />Committed Capacity of tate Fog*-tty.lm t' subsequent Committed Capacity Tests as follows: (a) once per each Summer period attd: <br />once per each Winter period at FPL's seleAk"tion,(b) at any time the QS is unable to comply with any material obligation under thist <br />Contract for a period :of thirty (30) days or:mwe in the aggregate as a consequence of an.event of Force Majeure, and (e) at anytime the QSr <br />fails in three consecutive mo nflis to achieve oft Annual Capacity Billing Factor, as defined in Appendix B (the "ACBF), equal to or greater <br />than 10%. The results of any such test shalfbe provided to FPL within seven (7) days oftlie conclusion of such test On and after the date of <br />such requested Committed Capacity Test, and until the completion of a subsequent.Committed Capacity Test; the Committed Capacity slab' <br />be deemed as the lower of the tested capacity or the Comnritted Capacity as setfortit in,Sectiom 5.1. <br />a4 6twithstanding anything to the contnvyherem, the Committed Capacity shall not exceed the amount set forth in Section 5.1 without ut tae <br />,phot written consent of FPL, such consent not unreasonably withheld. <br />.5,5 The "Capacity Delivery Date" shall be defined as the fust calendar day immediately after the date following the last to occur. of (a) the <br />'Facility's successful completion of the first Committed t Capacity Test but no earlier than the comtnencement date for deliveries of firm' <br />apacityand energy (as such is specified in Appendix E) and (b) the satisfaction by QS of the following DeliveryDate Conditions (defined <br />below); <br />(Continued on Sheetl&*M4) <br />p try:..t7naPy-UP M, Senior Virector, Regulatory Rates, Cost of Servke and Systems <br />Eil'+liclWO ;Tsitt(tt q' 1, =2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.