My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/11/2023
CBCC
>
Meetings
>
2020's
>
2023
>
07/11/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2023 12:11:11 PM
Creation date
9/14/2023 10:10:27 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/11/2023
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2023 -0180 -PAA -EQ <br />DOCKET NO. 20230046 -EQ <br />PAGE 11 <br />FLORIDA POvI/F.R & LIGHT COAIPAINY <br />Dontinue:I'rom $hv*I9.M <br />Attachment A <br />Page 6 of 42 <br />Original Shesl.�lft,it-i <br />5 W A certificate addressed`tim-SPL from a Licensed Professional Engineer (reasonably acceptable to <br />FFI, utla jl: itespects) stating: (a) the nam epi.* capacity rating of the Facility at the anticipated time of commercial <br />operation; vMch.must be at;least9ftaffhe Expected Nameplate Capacity Rating; (b) that the Facility is able to <br />generate electricenergy reliably in amounts expected by this Agreement and in accordance with all other terms and <br />conditions hereof; (c) that Start -Up Testing of the Facility has been completed; and (d) that, pursuant to Section 8.4, <br />all system protectionand control and Automatic Generation Control devices are installed and operational. <br />5:5.2 A certificate addressed to FPL from a Licensed Professional Engineer (reasonably acceptable to FPL in.all <br />respects).stating; itf conformance with the requirements of the Interconnection Agreement, that: (a) all required <br />interconnection facilities have been constructed; (b) all required interconnection tests have been completed; and (c) <br />the Facility is`physically'interconnected with the System in conformance with the Interconnection Agreement and <br />4b1e ta'dnl v0.energy consistent vrith the terrnscai t 0 Agreement: <br />1.51 A ow0wwooessed t Professional Engineer (reasonably acceptable to FPL in all <br />respects) stating that"QS has obtained or entered into all permits and agreements with: respect to: the Facility <br />necessary 'for constructlon, ownership,_ operation, and maintenance of the Facility (the `Required Agreements"). QS <br />must provide copies of an or all Required <br />Agreements requested by FPL. <br />5. Att i m a"law Oran or anoiney, registered or licensed in the State orf Wd s (reasonably <br />acceptable tci FF'L•i"H respects), stating, after all -appropriate and reasonable inquiry, that: (�),:QS has obtained or <br />entered.into'all Aet uit i Agreements; (b) neither QS nor the Facility is in violation of or suliject to any liability <br />under any appliic ible.law; and (c) QS'hswduly filed and had recorded .all of the agreements, documents, instruments, <br />mortgages, deeds of trust, and other writings described in Section %7, <br />55 Fk'L has received the Complctioit/Perfonn ance Secut ftough (e) the "Commercial Operation <br />} iX. afiall have ten (10) Business Days after receipt either to confirm to QS that all of the Delivery Date Conditions <br />havabeen satisfied or have occurred, or to state with specificity what FPL reasonably believes has notbeen <br />satisfied, <br />5,6 Thor QS snail ba" iiitled to receive capacity payor ents beginning on the Capd� Do very Date, provided, <br />the Capacity Delivery Pace"occurs on or before the iaf• Y#Ge date of the Avoidedl tttssuch later date permitted <br />by FPL pursuant to the following sentence). If the. Capacity Delivery Date does not occur on or before the <br />trteed Capacity Delivery Date, FPL shall be entitled to the Completion/Performance Security (as set forth i;* <br />Section 9) in full; and imadd tion, has the right but not the obligation to allow the QS up to an additional five (5 <br />months to achieve tle:tapacity Delivery Date. If the QS fails to achieve the Capacity Delivery Date either by (a) <br />the Guaranteed Delivery Date or b) such later date as permitted byFPL, FPL shall have no obligation to make any <br />capacity payments under this Contract and FPI, will be permitted to terminate this Contract, consistent with the <br />teaps hcaeitt, witltout mer obligations, duties or liability:to the QS.. <br />(, .. ."' bet:.•. _ ; <br />mer J'WW4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.