My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/11/2023
CBCC
>
Meetings
>
2020's
>
2023
>
07/11/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2023 12:11:11 PM
Creation date
9/14/2023 10:10:27 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/11/2023
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2023 -0180 -PAA -EQ Attachment A <br />DOCKET NO. 20230046 -EQ Page 7 of 42 <br />PAGE 12 <br />Third Revised Sheet No. 9.034 <br />ARIDA.r0WE tAJMG A" *mO*vLtett Sheet No. 9.034 <br />'•x� from SheetTl'ts.�i�3} <br />6. Testing Procedures <br />6.1 The Committed Capacity Test must be'completed successilillywithin a sixty -hour period (the "Demonstration Period'), which <br />,period, including the approximate start time of the Committed Capacity Test, shall be selected and scheduled by QS by means of a written <br />notice :to FPL delivered at least thirty (30) days prior to the start of such period The provisions of the foregoing sentence shall not apply to <br />W Committed Capacity Test required by FPL tmderany of the provisions of this Contract. FPL shall have the right to be present onsite to <br />tnonitoc Catunitted Capacity Test requited orpermitted under this Contract, <br />51 Committed Capacity Test results shall be based on a test period of twenty-four (24) consecutive hours. (the "Committed <br />Qapacity Test Period's at the highest sustained net KW rating at which the Facility can operate without exceeding the design operating <br />t ottS ,.temperdture> pressures, and other parameters refired by the applicable manufacturer(s) for steady-state operations at the Facility,: <br />i Qtis:a REF the Committed Capacity Test shall be conducted utiliairg as the sole fuel source fuels or energy sources included in the'. <br />definition in Section 366,91, Florida Statutos, The Committed Capacity Test Period shall commence at the time designated by the Q9, <br />pursuant to Section 6.1 or at such other time requested by FPL pursuant to Section 5.3 provided, however, that the Committed Capacity Test: <br />Period my commence earlier than such time in the event that FPI: is notified of, and consents to, such earliertime. <br />6.3 For the avoidance of doubt normal station service use of unit auxiliaries, including, withoutlimitation, cooling towers, heat, <br />exchangers, and other equipment required by law, shall be in service during the Committed Capacity Test Period Further, the QS shall affect; . <br />deliveries of any quantity and quality of contracted cogenerated steam to the steam host during the Conmritted Capacity Test Period. <br />6.4 The capacity of the Facility shall be the'avarage net capacity (generator ouWArd tus. auxiliary) measured over the Committed,. <br />Clapadty Ted Period <br />6,5 The Committed opacity Test shall be performed accot>opmdent industry testing procedures satisfaci"off tR; l4 jl : <br />wnFrisiatechnology of die t ',. <br />6,6 Except as otherwise provided herein, results of any Committed Capacity Test shall be submitted to FPL by the QS withinseven. <br />(7) daysof the conclusion of the Committed CapacityTest. <br />7. Payment for Ele <br />ym W*WProdttced by the Facility <br />7,1 , <br />FPL agrees to pay the QS for erYstgy"js#oditceti`by the' =" _ " oto gecordance with the rates and <br />procedures contained in FPL's approved Rate Sche AAed hereto as A A,, imy be amended from time to <br />time and pursuant to the election of energy payment options as spewed in APP°e Parties agree that this Contract shall be <br />subject to all of the provisions contained in Rate Schedule QS -2 as approved and the FPSC. <br />72 Firm Capacity <br />FPL agrees to pay the QS .far• the firm capacity described in Section 5 in accordance with the rates and procedures contained in <br />Rate Schedule QS -2, attached.hereto as Appendix A, as it may be amended and approved from time to time by the FPSC, and pun, uant <br />to the election of a capacity payment option as specified in Appendix E. The QS understands and agrees that capacity payments will <br />be made raider the early capacity payment options only if the QS has: achieved the Capacity Delivery Date and is delivering firm <br />capacity and energy to FPL. Once elected by the QS, the capacity payment option cannot be changed during the term: of this Contract. <br />7.3 Payments <br />Payments dire the QS will be made monthly and normally by the twentieth business day following the end of the billing period A <br />statement of the kilowatt-hours sold by the QS and the applicable avoided energy rate at which payments are being made shall. <br />accompanythe'payment to the QS <br />(Continued on Sheet o + 415); <br />Issued by: Tiffany Cohen, Director, Rates and Tariffs <br />Effective: June 9,2020 <br />3-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.