ORDER NO. PSC -2023 -0180 -PAA -EQ
<br />DOCKET NO. 20230046 -EQ
<br />PAGE 13
<br />F71,011MA POWF,R & LIGHT COMPA
<br />(Continued from Sheet;,)Wg 6
<br />8. EleelrloltyProduction and Plant Maintenance Schedule
<br />Attachment A
<br />Page 8 of 42
<br />Second Revised Shcd3 Xw 4:1338',
<br />Cancels:E6x�k,Shr�l�t► •.
<br />8.1 During the term of his` Contract, no later'dw sixty (60) days prior to the Capacity. Delivery Date and prior to April I of each
<br />calendar year thereafter, the QS shall submit to FPL in writing a detailed plan of: (a) the amount of &incapacity and energy to be generated
<br />by the Facility and delivered tc the Delivery Point for each month of the following calendar year, and (b) the time, duration and magnitude of
<br />any scheduled maintenance period(s) and any anticipated reductions.Awpacity.
<br />&2 By October 31 ofeach calendar year, FPL shall notify QS in writing whether the requested scheduled maintenance periods
<br />in the detailed pian are acceptable. if FPL objects to any of the requested scheduled maintenance periods, FPL shall advise the QS of the time
<br />period closest ttt the requested;period(s) when the qutage(s) can be scheduled. The QS shall schedule maintenance outages only during,
<br />,Pdi6ds approved by FPL, such approval not unreasonably withheld. Once the schedule for maintenance has been established and approved
<br />by FPL,.either Party may request a subsequent change in such schedule and, except when such event is due to Force Majeure, request
<br />approval for such change from the other Party, such approval not to be unreasonably withheld or delayed. Scheduled maintenance outag r
<br />days shall be limited to seven (7) days per calendar year unless the manufacturer's recommendation of maintenance outage days fix the
<br />technology arid equipment used by the Facility exceeds such 7day period, provided, such number of days is considered reasonable by prudent
<br />industry standards and does not exceed two (2) fourteen (14) day intervals, one in the Spring and one in the Fall, in any calendar yeat,
<br />'The scheduled maintenance outage days applicable for the QS are days in the Spring and days in the Fall of each calendar`
<br />year, providcd the conditions specified in the previous sentence are satisfied, in no event shall maintenance periods be scheduled during the
<br />owing patrons; June 1 throttpit and ittoitr hug Odobet
<br />� 8l#;sYtd; December 1 tiroutgh and including February 28 (or Z9*as the case rrtajx'
<br />8';3 The lS tthall t wally with reasonable requests by FPL regarding dayAo4Wand houlrrlly-hoar communication between :tom
<br />Patties relative to eleetrii* P0460, tali -maintenance scheduling.
<br />RA Dispolvil attd.Cttgdnol:.
<br />&AI The power supplied by the QS horem'do $hall, be;in the form of three-phase 60 Hertz alternating current, at,a nominal_
<br />operating voltage of d000volts (.-kV) and power factor dispatchable and controllable in -the range of 85% lagging to,
<br />85%leading as measured at the Delivery Point to maintain system operating; parameters, as specified by FPL.
<br />8.4.2A€ II,ti es during the'ttormofthes Contract, the 09 slS fpperate and maintain the Facility (8) in such a:manner as to ensure:
<br />:compliance withsihsobligations hereunder, -in accordance with prudent engineering and operating practices and applicable law, and (b) wilt
<br />all system protective equipment in setviddWILgrtever the Facility is camiected to, or is operated in parallel, with, FPL's system. The QS shall,
<br />install atfhe Facility those systempro�ction and control devices necessary to ensure safe and protected operation of all energized equipment
<br />during normal testing and repair. The QS shall have qualified personnel test and calibrate all protective equipment at regular intervals in:
<br />accordance with good engineering and operating practices. A unit functional trip test shall be perfoinned after each overhaul of the Facility's,
<br />turbine, generator or boilers and the results shall be provided to FPL prior to returning the Facility to service. The specifics of the unit.
<br />functional'. trip test will be consistent with good engineering and operating practices.
<br />8 4 3lf'tlie Facility is separated from the FPL system for any reasort, under no circumstances shall the QS reconnect the Facility'
<br />3Ff'L's systemittit#tsaut;fir&t obfairdng FPL's pprir viatten approval.
<br />$AADuring the taint of this Contract, the QS shall employ qualified personnel for managing, operating and maintaining the.
<br />T ftdy'alYl' #lir coordinating such with FPL. If the Facility has a Committed Capacity greater than 10 MW then, the QS shall ensure that
<br />operaipersatutel are on duty at all times; twenty-four (24) hours a calendar day and seven (7) calendar days a week. If the Facility has a
<br />t asruratte l Capacity equal to or less than 10 MW then the QS shall ensure that operating personnel are on duty at least eight (8) hours peri.
<br />day from 8:AM EST to 5 PM 9 T' from Monday to Friday, with an operator on call at all other hours.
<br />$A SIFPL Stair pt"eil times be a ccusek A to its obligation to purchase and receive energy and s;t Wty hereunder; and FPL shall'':
<br />have the ability to regtrire the QS to curtail or reduce deliveries of energy, to the extent necessary (a) to maintain the reliability and integrity
<br />of any part of FPL's system, (b) in the event that FPL determines that a failure to do so is likely to endanger life or property, or (c) is likely to
<br />result in significant disruption ofelectric service to FPL's customers. FPL shall give the QS prior notice, if practicable, of its intent to refuse,
<br />curtail or reduce FPL's acceptance of energyand firm capacity, pursuant to this Section and will act to minimize the frequency and duration:
<br />of such occurrences:
<br />(tiratad'tmrt Sheud)�u bt.
<br />Effeetivs: