My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/11/2023
CBCC
>
Meetings
>
2020's
>
2023
>
07/11/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2023 12:11:11 PM
Creation date
9/14/2023 10:10:27 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/11/2023
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2023 -0180 -PAA -EQ <br />DOCKET NO. 20230046 -EQ <br />PAGE 44 <br />III. FUrL,5VMV <br />Attachment A <br />Page 39 of 42 <br />Sheet No. 10.316 <br />• Describe all fuels'to be'used to generate eleddeityat the Facility. hrdicate Ste specific physical and chemical characteristics <br />of each fuel type (e.g., Btu content, sulfur content, ash content, etc.). Identify special considerations: regarding fuel supply <br />origin, source and handling, storage and processing requirements. <br />1, Provide armud fuel requirements (AIR) necessary to support the requirements pursuant to Section 36j 1, Florida Statutes„ <br />and duesptarmgd levels of generation and list.ihe assumptions used to dptaxmne these quarrtitie <br />t ' of the status of8re Biel suppSy Or**=M lrt prat 'to riueet'due ARFR in each year of the proposed< <br />operFacility. Use thecategories below to describe the current arrangement for securing the AFR. <br />Category <br />Description of Fuel Supply Arrangement fuel is from a;filly developed. <br />owned i- <br />source owned by one or more of the project participants <br />contract = <br />fully executed firm fuel contract exists between the developer(s) and fuel supplier(s) <br />LOI - <br />a letter ofintent for the fuel supply exists between developer(s) and fuel supplier(s) <br />REF = <br />renewable energy facility will bum biomass; waste, or another renewable resource <br />spot=: <br />fuel supply will be purchased on the spot market <br />none = <br />no firm fuel supply arrangement currerrtly in,place <br />other= <br />fuel supplyanwWmentwtl444,gots 9ftheabovecategories(pleasedescribe) <br />r Indicate the percentage of the Facility's AF.lR.v&ch is covered by, the above fuel supply arrangement(s) for each. proposed: <br />operating year. The percent of AFR covered for each operating year must total 100%. For fuel supply arrangements identified <br />as owned co»trao; cfr I,UI, provide documentation to support this category and explain the fuel price mechanism of tha <br />arrangement. In addititm , indicate whether or not the fuel price includes delivaryv4,if so, to what location. <br />• Describe fuel transirortation networks available for delivering all primary and secordlary;fuel to the Facility site. Indicate the <br />mode, route and distance of each segment of the journey,, from fuel source to the Energy Facility site. Discuss the current <br />status and pertinent factors impacting future availability of the transportation network. <br />4 Provide annual fuel transportation requirements (AFTR) necessary to support planned levdo 4f*0*00 and list the <br />assumptions used.todetermine these quantities. <br />• Provide a summary of the 'statics of dre fuel trMipottaiiun arrangements in place to meet' 1lie' A#rR in each year of the <br />proposed operating life of the Energy Facility. Use the categories below to describe the current arrangement, for securing the <br />AF'fR. <br />owned`= fuel transport via a fully developed system owned by one or more of the project participants <br />contract fully executed firm transportation.mitract:exiata between the developer(s) and fuel transporter(s) <br />I,QI a letter of intent for fuel transpott eloper(s) and fuel transporters) <br />Spot = fuel transportation will be pure arket <br />none no firm fuel transportation arrangement currently in place <br />other- fuel transportation arrangement whiclidoeatiot fit_any of * above;begcries (please describe) <br />• lntiioate• the percentage of the Facility's AA which is coverad',by the above fud, supply armngement('s) for each proposed: <br />operating year. The percent of AFR covered for each operating year must total 100%. For fuel supply arrangements identified: <br />as owned, contract, tar LM ptm* documentation to supportAtlas category and explain the transportation price mechapism OT, <br />the arrangement; <br />W Provide the maximum, min mum, and average fuel mventorylevels to be maintained for primary and secondary fuels at the <br />Facility site. List the assumptions used in determining the inventory levels. <br />(ContinuedonSheet 14. <br />Issuedby- S. E, Rom igx Director, Rates and'Tariff's <br />Effedivei May -22,;W <br />
The URL can be used to link to this page
Your browser does not support the video tag.