Laserfiche WebLink
ORDER NO. PSC -2023 -0180 -PAA -EQ <br />DOCKET NO. 20230046 -EQ <br />PAGE 45 <br />W. PIrAW uIs1 WTCtIAB1 YICONTWUAKUMI <br />Attachment A <br />Page 40 of 42 <br />Provide OA'f t!g gpert charadier stipa*O,# detailed explanation supporting the perfmmarece capabilities indicated. <br />.Ramp Ra*NW/mitu*) <br />'Peak Capability (Vo above Committed Capacity) <br />♦' btimum powealevel (°% of Committed Capacity) <br />♦: ,Facility Turnaround Time, Hotto Hot (houm) <br />♦ Start-up Time from Cold Shutdo #ws) <br />t Unit lin$.# qAes(y?)- <br />i MW and MYAR Control (MC, M..A @%ass exii .)) <br />V. Sr!'DUGAND LICENSING <br />• Provide a licensing/permitting milestone schedule which lists all permits, licenses and variances required to site the Facility— <br />The milestone schedule,shall also identify key milestone dates for baseline monitorin , application preparefipN agency tevieak <br />certification and hemsinglsiting board approval, and agency permit issuance. <br />• Provide a licensing/penuitting plan that addresses the issues of air emissions; water use, wastewater discharge, wetlw*, <br />endangered species, protected properties, solid waste, surrounding land use, zoning for the Facility, associated linear facilities;. <br />and support of and opposition to the Facility. <br />• last the emission/effluent discharge limits the Facility will meet, and describe in detail the p lltU'�S?rt entero toprga t4r.tt <br />used to meet these limits. <br />A .VMi'v"t TY bEVELOPMENT AND PERFORMANCE <br />• Submit:'a detailed engineering, procurement, construction, startup .and commercial operation schedule. The schedule abaft, <br />include milestones for site acquisition, engineering phases, selection of the major equipment vendors, architect engineer, EP( <br />contractor, and Facility operator, steam hostmtegration, and delivery of major equipment. A discussion of the current status i <br />each milestone should also be included where applicable. <br />Attach a diagram of the power block arrangement. Provide a list of the major equipment vendors and the name and model <br />number of the major equipment to be, installed. <br />* Provide a detailed Atscrip6en6ftha'ptoposed environmental control technology fa &.Vacilrty and describe the capabilities <br />ofthe proposed technology, <br />+r AtWIt preliminary flow diagrams for the steam system, water system, and fuel system, and amain electrical one line <br />for'the Facility. <br />s; State the expected haat sats OW`,at '75. degrees Fahrenheit for loads of 100%, 7594, and 50%. In addition, attach w <br />preliminary heat balms fdr the Fetidly; <br />• OTE, g gity' Leq*e"ttls:sGl"1# dymonstrat tg that the facility 00.19e1! <br />"WOW <br />atlleaj <br />(Continued on Sheet No,10,318) <br />Alyn S. F Romig,Director, Rates and Tariffs <br />VIAOWV�,: May 22, 2007 <br />