Laserfiche WebLink
Indian River County Work Order Number — 2023051-01 <br />Sector 4 Beach and Dune Restoration Project Exhibit 1 - Scope of Work <br />Exhibit 1 <br />Scope of Work <br />Sector 4 Beach and Dune Restoration Project <br />Conceptual Design, Pre -Application Meeting, and Public Outreach <br />Introduction: The 'Indian River County Beach Preservation Plan Update" (Plan, dated June <br />2020) defines the limits of Sector 4 as from Florida Department of Environmental Protection <br />(FDEP) Reference Monument R-55 (about 3/4 mile south of the northern limit of John's Island) to <br />R-70 (about 2,000 feet north of the County's Tracking Station Beachfront Park). The 2019 BPP <br />identifies that prior to 2005, Sector 4 experienced an accretional trend; however, an erosional <br />trend of 1.7 ft/yr was experienced from 2013 to 2019. To offset recent erosional trends, private <br />entities have performed emergency dune restoration projects following significant hurricane <br />events. The dune system within Sector 4 and elsewhere within the Treasure Coast were most <br />recently damaged by Hurricane's Ian and Nicole in 2022. This Work Order provides services in <br />support of conceptual design, pre -application meeting with regulatory staff, and a public outreach <br />meeting to support a dune restoration project within Sector 4. It is our understanding that the <br />Sector 4 Dune Restoration Project is intended to only place sand above the mean high water line <br />to avoid the FDEP and USACE requiring the COUNTY to perform nearshore hardbottom monitoring <br />which is typical for beach restoration projects proposed in close proximity to nearshore <br />hardbottom. The work is proposed to be performed by Coastal Technology Corporation (Coastal <br />Tech). <br />Task 1 — Design - Conceptual: Coastal Tech will meet with the County to identify the County's <br />specific objectives and design criteria for the Project. The County will provide available historic <br />hydrographic beach profile surveys of the Project area including the most recent survey data <br />conducted in the fall of 2022 or summer 2023 following Hurricanes Ian and Nicole. The surveys <br />are expected to be accepted by FDEP for a pre -construction survey. The County will provide <br />records of prior nourishment efforts performed by the County and by upland property owners. It <br />is our understanding that the County is seeking an FDEP Coastal Construction Control Line (CCCL) <br />and USACE Nationwide permits for authorization of the work. Informally, FDEP staff have <br />identified a Joint Coastal Permit could be a more desirable method of FDEP authorization. The <br />design effort is intended to provide the information required for a USACE Nationwide Permit <br />Authorization and FDEP CCCL Permit Authorization. If the USACE or FDEP require additional <br />design information, we can provide this additional information as an additional service to the <br />County under separate authorization. <br />Page 1 of 3 <br />August 22, 2023 <br />