Laserfiche WebLink
Indian River County Work Order Number - 2023051-01 <br />Sector 4 Beach and Dune Restoration Project Exhibit 1 - Scope of Work <br />Task 1a — Conceptual Design: To develop the proposed dune restoration conceptual design, <br />Coastal Tech will: <br />• Perform an assessment of historical and existing shoreline and volume change analysis <br />based upon: <br />o review of the prior Beach Preservation Plans (BPP) — to identify historical <br />volume and shoreline changes; and <br />o review of survey data provided by the County collected after the 2019 BPP — <br />to identify recent volume and shoreline changes since completion of the 2019 <br />BPP. <br />• Estimate the sand volumes required to maintain a stable beach, based upon the <br />historical volume change analysis. <br />• Review historical native beach geotechnical information provided in the BPP, in the <br />Sector 3 or Sector 5 design documents, on FDEP ROSSI website, or as provided by <br />the County. <br />• Compare the native beach geotechnical information to the geotechnical information <br />for the upland sand mines that responded to the County's most recent dune <br />restoration solicitations or as identified by the County. The native beach and upland <br />mine geotechnical comparison will be based upon mean grain size, percent fines, <br />sorting value, percent carbonate, and munsell color (wet/dry)sediment color, <br />composition data <br />• Develop a conceptual design for sand fill placement based upon historic dune crest <br />widths and heights that maximizes sand placement within the dune without placement <br />of sand below the mean high water line. The conceptual design template is expected <br />to restore the dune up to pre -Ian and Nicole conditions while maintaining sand <br />placement above the mean high water line. This approach is expected to avoid permit <br />required nearshore Hardbottom monitoring. <br />• Prepare an opinion of probable construction costs (OPC) for the proposed conceptual <br />design. <br />• Prepare a summary letter report documenting the results of the above with Conceptual <br />Design Drawings illustrating the proposed construction template. <br />• Confer with the County to (a) discuss the proposed dune restoration template, and <br />(b) identify any revisions to the letter report deemed appropriate. <br />Task 2 — Permitting — Pre -Application Conference <br />Task 2a — Pre -Application Conferences: Coastal Tech will request an informal Pre -Application <br />Conference with FDEP and a second conference with USACE staff to discuss the Project as <br />envisioned or formulated, any issues and how they might be addressed, and requirements for <br />obtainment of permits. Coastal Tech, in collaboration with FDEP staff and USACE staff, will <br />invite representatives from FWC, USFWS, NMFS, USACE, and others as may be identified by <br />the FDEP, USACE, and/or County to participate in the Pre -Application Conferences; Coastal <br />Tech will then prepare a written summary of each conference. <br />Page 2 of 3 <br />August 22, 2023 <br />