7.5.7 Non -Plenum Applications
<br />The storage temperature range for the cable on the original shipping reel shall be -400°C to
<br />+700°C. The installation/operating temperature range for riser cables shall be -200°C to +700°C.
<br />Testing shall be in accordance with FOTP-3.
<br />7.5.8 Plenum Cables up to 24 Fibers (Multimode OFNP)
<br />The fibers may be stranded around a dielectric central member and surrounded by layered
<br />aramid yarns. The aramid yarns shall serve as the tensile strength member of the cable. A ripcord
<br />shall be applied between the aramid yarns and the outer jacket to facilitate jacket removal. The
<br />outer jacket shall be extruded over the aramid yarns for physical and environmental protection.
<br />7.5.9 Plenum Applications
<br />The storage temperature range for the cable on the original shipping reel shall be -400°C to
<br />+700°C. The installation/operating temperature range for plenum cables shall be -200°C to
<br />+700°C. Testing shall be in accordance with FOTP-3.
<br />7.5.10 List of Items for Fiber Optics Cabling
<br />The items and services listed below are not an all-inclusive list. Furnish, install, splice, and test
<br />all fiber optic cable, fiber optic assemblies, patch cords, and all passive network infrastructures
<br />including, but not limited to, splice trays and closures, patch panels, fan—outs, terminations, and
<br />fusion splices. The fiber-optic cables listed below shall conform to the specifications in section
<br />7.5.2.
<br />a) 12 fiber, SM, loose —tube construction (aerial placement or underground placement)
<br />b) 24 fiber, SM, loose —tube construction (aerial placement or underground placement)
<br />c) 48 fiber, SM, loose —tube construction (aerial placement or underground placement)
<br />d) 72 fiber, SM, loose —tube construction (aerial placement or underground placement)
<br />e) 96 fiber, SM, loose —tube construction (aerial placement or underground placement)
<br />f) 144 fiber, SM, loose — tube construction (aerial placement or underground placement)
<br />g) 24 fiber, SM, all dielectric self-supporting construction (aerial placement)
<br />h) 48 fiber, SM, all dielectric self-supporting construction (aerial placement)
<br />i) 96 fiber, SM, all dielectric self-supporting construction (aerial placement)
<br />j) 144 fiber, SM, all dielectric self-supporting construction (aerial placement)
<br />k) 24 fiber, SM, riser rated construction
<br />1) 48 fiber, SM, riser rated construction
<br />m) 96 fiber, SM, riser rated construction
<br />n) 12 fiber, SM, plenum construction
<br />o) 24 fiber, SM, plenum construction
<br />p) 48 fiber, SM, plenum construction
<br />q) 96 fiber, SM, plenum construction
<br />r) 12 fiber, MM, plenum rated, tight buffer
<br />s) 24 fiber, MM, plenum rated, tight buffer
<br />t) 12 fiber, MM, plenum rated construction
<br />u) 24 fiber, MM, plenum rated construction
<br />7.6 Cable Pulling
<br />Before starting any construction, all of the Contractor's personnel (including subcontractors) shall be
<br />thoroughly familiar with and shall comply with Occupational Safety and Hazard Act (OSHA) regulations,
<br />FDOT safety practices and policies, and the Florida State "One -Call" System requirements.
<br />30
<br />
|