My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/2/1996
CBCC
>
Meetings
>
1990's
>
1996
>
7/2/1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:05:50 PM
Creation date
6/16/2015 4:01:30 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/02/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />Boa 98� 1 -7 <br />1. A final plat in conformance with the approved preliminary PD <br />plat; and <br />2. A completed Contract for Construction of Remaining.Required <br />Improvements; and <br />3. An Engineer's Certified Cost Estimate for the remaining <br />required improvements; and <br />4. An appropriate security arrangement acceptable to the county <br />attorney's office. <br />ANALYSIS: <br />None of 'the required subdivision improvements have been <br />constructed. The applicant is proposing to "bond -out" for the <br />required subdivision improvements for all three areas as provided <br />for in the county's land development regulations. The public works <br />and utility services departments have reviewed and approved the <br />submitted Engineer's Certified Cost Estimate and corresponding <br />letter of credit amount. The county attorney's office has reviewed <br />and approved the submitted Contract for Construction, and the <br />letter of credit which represents 1158 of the estimated cost to <br />construct the required improvements. It should be noted that all <br />improvements within Windsor will be private, with the exception of <br />certain utilities facilities that will be dedicated to Indian River <br />County as required by the utilities services department. <br />RECOMMENDATION: <br />Staff recommends that the Board of -County Commissioners: <br />1. Grant final plat approval for Windsor Plat 9; and <br />2. Authorize the Chairman to execute the submitted Contract for <br />Construction of Remaining Required Improvements and accept the <br />letter of credit that secures the contract. <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Bird, the Board unanimously approved <br />the final plat for Windsor Plat 9, as recommended by <br />staff. <br />E. Floodplain Cut & Fill Balance Waiver for Lot 13, Block 13, Vero Lake <br />Estates, Unit 2 - MGB Construction, Inc. <br />The Board reviewed a Memorandum of June 24, 1996: <br />TO:. James Chandler <br />County Administrator <br />THROUGH: James W. Davis; P.E.c,,�•O <br />Public Works Director <br />and <br />Roger D. Cain, P.E. A%• <br />County Engineer r <br />FROM: David B. Cox, P.E.`'&- <br />Civil Engineer <br />SUBJECT: Request for Floodplain Cut and Fill Balance Waiver for Lot 13, Block 13, <br />Vero Lake Estates, Unit 2 <br />REFERENCE: Project No. 96060099 <br />DATE: June 24, 1996 CONSENT AGENDA <br />DESCRIPTION AND CONDMONS <br />MGB Construction, Inc. has submitted a building permit application fora a single family <br />residence on the subject property. The site is located in an AE special flood hazard zone, <br />JULY 29 1996 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.