My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-221
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 3:34:35 PM
Creation date
10/31/2023 3:19:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
08/24/1999
Control Number
1999-221
Entity Name
Treasure Coast Contracting, Inc.
Subject
Sebastian Water Assessment Project, Phase 2C
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK DIRECTIVE CHANGE <br />(Instructions on reverse side) No. <br />PROJECT: " DA'T'E OF ISSUANCE: <br />OWNER: <br />(Name, <br />Address) <br />CONTRACTOR: OWNER's project No. <br />ENGINEER: <br />CONTRACT FOR; ENGINEER's Project No <br />You are directed to proceed promptly with the following change(s): <br />Description: _ <br />Purpose of Work Directive Change: <br />Attachments: (Iist documents supporting change) <br />If a claim is made that the above change(s) have affected Contract Price or Contract Time, <br />any claim for a Changc Order Based thereon will involve one of the following methods of <br />determining the effect of the change(s). <br />Method of determining change in Method of determining change in <br />Contract Price: Contract Time <br />❑ Time and materials ❑ Contractor's records <br />❑ Unit prices C] Engineer's records <br />❑ Cost plus fixed fee Cl Other <br />0 Other <br />Estimated increase (decrease) in Contract Estimated increase (decrease) in Conti -act <br />Price: $ Time: days. If the change <br />If the change involves an increase, the esti- involves an increase, the estimated time is <br />mated amount is not io be exceeded with- not to be exceeded without further autho- <br />out further authorization. rization. <br />RECOMMENDED: <br />by efian... <br />AUTHORIZED: <br />by <br />1 <br />EJCDC No. 1410.8-F (1983 Edition) <br />Peepaecd by the En6neerV )Writ Contac[ Owum all Cam" ittee and endorsed by the Attoetated General Comrntore o[Maerka <br />t <br />e <br />Mn()8pp//00yy�� -'1.7�rtt <br />tt� 4 <br />WORK DIRECTIVE CHANGE <br />(Instructions on reverse side) No. <br />PROJECT: " DA'T'E OF ISSUANCE: <br />OWNER: <br />(Name, <br />Address) <br />CONTRACTOR: OWNER's project No. <br />ENGINEER: <br />CONTRACT FOR; ENGINEER's Project No <br />You are directed to proceed promptly with the following change(s): <br />Description: _ <br />Purpose of Work Directive Change: <br />Attachments: (Iist documents supporting change) <br />If a claim is made that the above change(s) have affected Contract Price or Contract Time, <br />any claim for a Changc Order Based thereon will involve one of the following methods of <br />determining the effect of the change(s). <br />Method of determining change in Method of determining change in <br />Contract Price: Contract Time <br />❑ Time and materials ❑ Contractor's records <br />❑ Unit prices C] Engineer's records <br />❑ Cost plus fixed fee Cl Other <br />0 Other <br />Estimated increase (decrease) in Contract Estimated increase (decrease) in Conti -act <br />Price: $ Time: days. If the change <br />If the change involves an increase, the esti- involves an increase, the estimated time is <br />mated amount is not io be exceeded with- not to be exceeded without further autho- <br />out further authorization. rization. <br />RECOMMENDED: <br />by efian... <br />AUTHORIZED: <br />by <br />1 <br />EJCDC No. 1410.8-F (1983 Edition) <br />Peepaecd by the En6neerV )Writ Contac[ Owum all Cam" ittee and endorsed by the Attoetated General Comrntore o[Maerka <br />t <br />e <br />Mn()8pp//00yy�� -'1.7�rtt <br />
The URL can be used to link to this page
Your browser does not support the video tag.