Laserfiche WebLink
WORK DIRECTIVE CHANGE <br />INSTRUCTIONS <br />A. GENERAL INFORMATION <br />This document was developed for use in situations involving changes in the Work which, <br />if not processed expeditiously, might delay the Project. These changes are often initiated <br />in the held and may affect the Contract Price or the Contract Time. This is not a'Change <br />Order, but only a directive to proceed with Work that may be included in a subsequent <br />Change Order. <br />For supplemental instructions and minor changes not involving a change in the Contract <br />Price or the Contract Time, a Field Order may be used. <br />B. COMPLETING THE WORK DIRECTIVE CHANGE FORM <br />Engineer initiates the form, including a description of the items involved and attachments. <br />Based on conversations between Engineer and Contractor, Engineer completes the fol- <br />lowing: <br />METHOD OF DETERMINING CHANGE, IF ANY, IN CONTRACT PRICE: Mark <br />the method to be used in determining the final cost of Work involved and the net <br />effect on the Contract Price. If the change involves an increase in the Contract Price <br />and the estimated amount is approached before the additional or changed Work is <br />completed, another Work Directive Change must be issued to change the time or <br />Contractor may stop the changed Work when the estimated time is reached. If the <br />Work Directive Change is not likely to change the Contract Time, the space for <br />estimated increase (decrease) should be marked "Not Applicable' <br />METHOD OF DETERMINING CHANGE, IF ANY, IN CONTRACT TIME: Mark <br />the method to be used in determining the change in Contract Time and the estimated <br />increase or decrease in Contract Time. If the change involves an increase in the <br />Contract Time and the estimated time is approached before the additional or changed <br />Work is completed, another Work Directive. Change must be issued to change the <br />time or Contractor may stop the changed Work when the estimated time is reached. <br />If the Work Directive Change is not likely to change the Contract Time, the space <br />for estimated increase (decrease) should be marked "Not Applicable". <br />Once Engineer has completed and signed the form, all copies should be sent to Owner for <br />a�gui+1.4� [uu11u uuea ilVt 11 i1Yu rill ttlVlll r' iv AlllilUllGG V11a1]ty`G5 in <br />Price or Time. Once authorized by Owner, a copy should be sent by Engineer to Con- <br />tractor. <br />Once the Work covered by this directive is completed or final cost and time determined, <br />Contractor should submit documentation for inclusion in a Change Order. <br />THIS IS A DIRECTIVE.TO PROCEED WITH A CHANGE THAT MAY AFFECT <br />THE CONTRACT PRICE ORTHE CONTRACTTIME. A CHANGE ORDER, IF ANY, <br />SHOULD BE CONSIDERED PROMPTLY. <br />00000-30 <br />