Laserfiche WebLink
I <br />c) From M calendar days to M calendar days from the effective date of Notice to <br />s Proceed, the CONTRACTOR shall complete the following tasks: <br />1. Clean up project area,. <br />2. Remove all equipment and material from projec"ite. <br />3. Perform contract close-out procedures. - <br />Completion of all tasks outlined above (i.e., Subparagraphs a, b, and c) constitute Final <br />Completion. <br />6. The following documents are attached to and made a condition of this Bid: <br />(a) Schedule of Bid Items. <br />(b) Required Bid Security in the Form of Insurance. <br />7. Communications concerning this Bid shall be addressed to: <br />Michael C. Hotchkiss, P.E.. <br />Environmental Engineer <br />(5601) 770-5321 <br />The address of Bidder indicated below is as follows: <br />Tr—ae„ rnaet_jCQatX _t_Jng_, Tnr <br />P.4. Box 650249 <br />6290 old Dixie <br />Vero Beach, 4L 329605 <br />PH bb2—Z45U7— <br />FAX 562-4721 <br />R The term-:® --,--d un ut.:� mid + • ,+ <br />,..,.. ... .m .,,u ri�ut�yi tvc ueiuleu in the General conditions Of t e <br />Construction Contract include as part of the Contract Documents have the <br />meanings assigned to them in the General Conditions. <br />SUBNU'I'TED ON August 10 1999 <br />00310.4 <br />