Laserfiche WebLink
Indian River County Work Order Number - 2 <br />Sector 4 Dune Restoration Project Exhibit 1 - Scope of Work <br />Coastal Tech will: <br />• prepare draft Technical Specifications. <br />• provide the draft Design Document and Technical Specifications to the County for <br />review and acceptance. <br />Task 1b — Final Desian: Coastal Tech will prepare final design drawings — in the form of 24" <br />x 36" drawings for the proposed Project — consistent with the USACE and FDEP permits for <br />the Project obtained under Task 2. The drawings shall be prepared after permit issuance or <br />otherwise as requested by the County. Final design drawings shall include Technical <br />Specifications suitable for construction purposes. <br />Task 2 — Permitting <br />Task 2a — Permit Applications: In general, Coastal Tech will prepare and submit permit <br />application forms to allow multiple nourishments over a 15 year period — expected to include: <br />(a) an FDEP Joint Coastal Permit, and (b) USACE application "ENG FORM 4345" for a USACE <br />Standard Permit. The applications shall include the following information: <br />a) response to each application item; <br />b) permit sketches (preliminary design drawings) prepared under Task 1a; <br />c) Pre -Application conference reports developed under prior authorization; <br />d) recent aerial with limits of the Project fill area superimposed; <br />e) the Design Document prepared under Task 1a; <br />f) a draft Sediment QC/QA Plan; and <br />g) a draft Physical Monitoring Plan. <br />Coastal Tech will review the draft permit applications with the County and incorporate <br />revisions as appropriate, prior to submitting the applications to FDEP and USACE. The County <br />will provide all application fees, publishing fees, and any additional surveys, investigations, <br />testing, or reports as may be required by the agencies. The County will execute the <br />applications designating Coastal Tech as the County's agent. <br />Task 2b — Permit Processin4: Coastal Tech will make informal contact with FDEP and USACE <br />staff to address staff questions regarding the application and Project. Coastal Tech will <br />compile, clarify, and provide existing information as may be requested by FDEP and USACE <br />staff. Coastal Tech will represent the Project before regulatory staff toward obtainment of <br />permits and to negotiate acceptable permit conditions, as (a) may be required by the USACE <br />and FDEP, and (b) as acceptable to the County. Coastal Tech with the assistance of EAI, and <br />CSA via sub -contract with Coastal Tech, will respond to any reasonable staff requests for <br />additional information (RAI) as related to sea turtles and hardbottom. It is expected that the <br />FDEP and USACE may each issue up to two RAIs. <br />Task 3 - Bidding Phase Services: Coastal Tech will assist the County with solicitation of bids <br />to provide for construction of the Project via use of upland sand sources <br />Task 3a - Bidding Phase: Coastal Tech will assist the County with preparation of Bid <br />Documents and solicitation of bids and award of a construction contract for the Project. <br />Coastal Tech will revise the Drawings and Technical Specifications - prepared under prior <br />authorization - to (a) reflect the any revisions requested by the County, and (b) address <br />the bid dates identified by the County. Coastal Tech will assist the County with review and <br />Page 2 of 3 <br />September 22, 2023 <br />