My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177 A
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177 A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2023 1:44:09 PM
Creation date
11/13/2023 1:42:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177A
Entity Name
Summit Construction Management, Inc.
Subject
Dale Wimbrow Park Improvements
Project Number
9625B
Bid Number
9061
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />Y <br />SECTION 02303 <br />LIME ROCK BASE COURSE <br />1. DESCRIPTION <br />1 <br />A. Under this item, the Contractor shall construct a lime rock base course upon <br />the completed stabilized subgrade. <br />The base course shall be construcl.ed in <br />accordance with the lines and grades and typical section as shown on the <br />drawings. <br />2. MATERIALS <br />A. The Contractor may use lime rock for the base course from either the Ocala <br />Formation or the Miami Oolite . Formation at his option, provided it meets <br />the Specifications contained herein and complies with Section 911 "Lime rock <br />Material for Base and Stabilized Base" of the 1986 Edition of Florida D.O.T.'s <br />Standard Specifications for Road and Bridge Construction. Only one of the <br />two grades of lime rock shall be used on the project. <br />n, Tha material ghall-he —scl epi nr krnlran ICK to Qtr h ciya hafnre heing ninf- rton the road, that not less than 97 percent will pass a 3 1/2 inch sieve and it <br />Mh.,ll be ceded ^:f;•. l down to dust. Al! fi^ at^ ^! shall c t ntire!ygr.. .... .....y .. ... s. <br />of dust of fracture. <br />3. PLACEMENT OF MATERIAL <br />A. After the subgrade is completed and approved, the Con tractor shall furnish <br />and spread the lime rock in a uniform distribution. Segregated areas of fine or <br />course rock will not be permitted. Such areas shall be removed and replaced <br />with properly graded rock. <br />i B. After the spreading is completed, the entire surface shall be scarified and <br />shaped so as to produce the required grade and cross section after <br />compaction. <br />4. MOISTURE CONTENT <br />A. When the lime rock does not have the proper moisture content to obtain the <br />required density, wetting or drying wiii be requited. v nun waicr is added, it <br />shall be mixed in uniformly. Wetting or drying operations shall involve manip- <br />ulation of the entire width and depth of the base course before compaction. <br />5. COMPACTION <br />A. The required compaction of the lime rock base course shall be a minimum of <br />98 percent of the maximum dry density. <br />B. No less than 8 10 ton steel drum or pneumatic tired roller shall be used to <br />compact the lime rock base course. Ali depressions shall be filled and the <br />process of rolling and filling shall continue until a thoroughly compacted <br />uniform surface is produced. During final compaction operations, if blading of <br />any area is necessary to obtain the true grade and cross section, the compac- <br />tion operations for such areas shall be completed prior to making the field <br />density compaction test on Ilse finished base. <br />02303-1
The URL can be used to link to this page
Your browser does not support the video tag.