My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177 A
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177 A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2023 1:44:09 PM
Creation date
11/13/2023 1:42:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177A
Entity Name
Summit Construction Management, Inc.
Subject
Dale Wimbrow Park Improvements
Project Number
9625B
Bid Number
9061
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />A. The maximum density and optimum moisture shall be determined in <br />accordance with the Modified Proctor Test procedures of ASTM D1557 or <br />AASH T v T i 80 (Metilud D). Tile penxlliage compaction and in piace <br />density shall be determined according to procedures of ASTM D2167 "Test <br />for Density of Soil In Place by the Rubber Balloon Method" or the nuclear <br />method ASTM D2922. In general, one Modified Proctor 'rest per 300 lineal <br />feet of roadwork shall be performed on a representative sample of base <br />trnateriai froth iocation(s) designated by the Engineer. in place density testing <br />shall be performed at the rate of one test per 300 lineal feet of roadwo,k or <br />5000 sq. ft. of parking area at comparable locations unless otherwise specified <br />by the Engineer. <br />02303-2 <br />r <br />j C. Should the subgrade material become mixed with the base course material at <br />any time, Elle Contractor shall remove the mixture, reshape and recompact <br />t the subgrade, replace the materials removed with additional lime rock, and <br />reshape and recompact the lime rock base at no cost to the Owner. <br />D. If cracks or checks appear in the base which would impair the structural <br />integrity of the base in the opinion of the Engineer, the Contractor shall <br />remove the cracks or checks by rescarifying, reshaping, refilling with lime rock <br />where necessary, and recompacting at no cost to the Owner. <br />i <br />E. The finished lime rock base shall be checked for thickness at intervals of not <br />more than 300 feet. Areas which are less than lit inch deficient in thickness <br />shall be corrected by scarifying and adding rock if the Engineer determines <br />that the area is extensive or may adversely affect the quality of the finished <br />work. The scarifying shalt extend for 50 feet either side of the deficient area. <br />E 6. PRIME COAT <br />A. Tile prime coat shall be a rapid curing liquid cut back asphalt equal or <br />equivalent to RC -70 or RC -250 at the Contractor's option, and conforming to <br />Sections 300 and 916 2 of the 1986 Edition of the Florida D.O.T. Standard <br />Spec ificaiiolis for Hund and Bridge C -UM iuctiuli. <br />t B. The surface of the base maternal shall be cleaned after final colnpaciloll and <br />the moisture content of the base shall not exceed 90 percent of the optimum <br />moisture before the prime coat is applied. The prime coat shall be applied <br />uniformly with a pressure distributor. The entire length of the spray bar shall <br />be set at the height above the surface recommended by the Manufacturer for <br />even distribution. The prime coat shall be applied to the finished base course <br />at the rate of 0.15 gallons per square yard at a temperature between 1000 F. <br />to 1500 F. The prime coat shall be applied such that a period of no longer <br />than two (2) hours lapse prior to application of the asphaltic concrete wearing <br />course, unless the prime coat is covered with sand or <br />screenings as outlined in Section 300-6.5 of the 1986 Edition of the Florida <br />D.O.T. Specifications. <br />7. TESTING <br />A. The maximum density and optimum moisture shall be determined in <br />accordance with the Modified Proctor Test procedures of ASTM D1557 or <br />AASH T v T i 80 (Metilud D). <br />Tile penxlliage compaction and in piace <br />density shall be determined according to procedures of ASTM D2167 "Test <br />for Density of Soil In Place by the Rubber Balloon Method" or the nuclear <br />method ASTM D2922. In general, one Modified Proctor 'rest per 300 lineal <br />feet of roadwork shall be performed on a representative sample of base <br />trnateriai froth iocation(s) designated by the Engineer. in place density testing <br />shall be performed at the rate of one test per 300 lineal feet of roadwo,k or <br />5000 sq. ft. of parking area at comparable locations unless otherwise specified <br />by the Engineer. <br />02303-2
The URL can be used to link to this page
Your browser does not support the video tag.