40 <br />A. The maximum density and optimum moisture shall be determined in <br />accordance with the Modified Proctor Test procedures of ASTM D1557 or <br />AASH T v T i 80 (Metilud D). Tile penxlliage compaction and in piace <br />density shall be determined according to procedures of ASTM D2167 "Test <br />for Density of Soil In Place by the Rubber Balloon Method" or the nuclear <br />method ASTM D2922. In general, one Modified Proctor 'rest per 300 lineal <br />feet of roadwork shall be performed on a representative sample of base <br />trnateriai froth iocation(s) designated by the Engineer. in place density testing <br />shall be performed at the rate of one test per 300 lineal feet of roadwo,k or <br />5000 sq. ft. of parking area at comparable locations unless otherwise specified <br />by the Engineer. <br />02303-2 <br />r <br />j C. Should the subgrade material become mixed with the base course material at <br />any time, Elle Contractor shall remove the mixture, reshape and recompact <br />t the subgrade, replace the materials removed with additional lime rock, and <br />reshape and recompact the lime rock base at no cost to the Owner. <br />D. If cracks or checks appear in the base which would impair the structural <br />integrity of the base in the opinion of the Engineer, the Contractor shall <br />remove the cracks or checks by rescarifying, reshaping, refilling with lime rock <br />where necessary, and recompacting at no cost to the Owner. <br />i <br />E. The finished lime rock base shall be checked for thickness at intervals of not <br />more than 300 feet. Areas which are less than lit inch deficient in thickness <br />shall be corrected by scarifying and adding rock if the Engineer determines <br />that the area is extensive or may adversely affect the quality of the finished <br />work. The scarifying shalt extend for 50 feet either side of the deficient area. <br />E 6. PRIME COAT <br />A. Tile prime coat shall be a rapid curing liquid cut back asphalt equal or <br />equivalent to RC -70 or RC -250 at the Contractor's option, and conforming to <br />Sections 300 and 916 2 of the 1986 Edition of the Florida D.O.T. Standard <br />Spec ificaiiolis for Hund and Bridge C -UM iuctiuli. <br />t B. The surface of the base maternal shall be cleaned after final colnpaciloll and <br />the moisture content of the base shall not exceed 90 percent of the optimum <br />moisture before the prime coat is applied. The prime coat shall be applied <br />uniformly with a pressure distributor. The entire length of the spray bar shall <br />be set at the height above the surface recommended by the Manufacturer for <br />even distribution. The prime coat shall be applied to the finished base course <br />at the rate of 0.15 gallons per square yard at a temperature between 1000 F. <br />to 1500 F. The prime coat shall be applied such that a period of no longer <br />than two (2) hours lapse prior to application of the asphaltic concrete wearing <br />course, unless the prime coat is covered with sand or <br />screenings as outlined in Section 300-6.5 of the 1986 Edition of the Florida <br />D.O.T. Specifications. <br />7. TESTING <br />A. The maximum density and optimum moisture shall be determined in <br />accordance with the Modified Proctor Test procedures of ASTM D1557 or <br />AASH T v T i 80 (Metilud D). <br />Tile penxlliage compaction and in piace <br />density shall be determined according to procedures of ASTM D2167 "Test <br />for Density of Soil In Place by the Rubber Balloon Method" or the nuclear <br />method ASTM D2922. In general, one Modified Proctor 'rest per 300 lineal <br />feet of roadwork shall be performed on a representative sample of base <br />trnateriai froth iocation(s) designated by the Engineer. in place density testing <br />shall be performed at the rate of one test per 300 lineal feet of roadwo,k or <br />5000 sq. ft. of parking area at comparable locations unless otherwise specified <br />by the Engineer. <br />02303-2