My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177 A
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177 A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2023 1:44:09 PM
Creation date
11/13/2023 1:42:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177A
Entity Name
Summit Construction Management, Inc.
Subject
Dale Wimbrow Park Improvements
Project Number
9625B
Bid Number
9061
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />SECTION 02304 <br />CEMENTED COQUINA SHELL BASE COURSE <br />1. DESCRIPTION <br />A. Under this item, the Contractor shall furnish all equipment, labor, materials, <br />and transportation necessary to construct a Coquina shell base course upon <br />the completed stabilized subgrade. The base course shall be constructed in <br />accordance with the lines, grades, and typical section as shown on the Draw- <br />ings. Unless otherwise noted construction shall conform to the provisions of <br />Florida D.O.T. Standard Specifications for Road and Bridge Construction, <br />Section 250, 1986 Edition. <br />2. MATERIALS <br />A. Coquina shell shall conform to the requirements of Florida D.O.T. Standard <br />Specifications, 1986 Edition, Section 915, and shall be from a source accept- <br />able to Florida D.O.T. The material shall have a minimum LBR value of 100. <br />Prior to placement, the material shall be crushed or broken to such a size <br />f that no less than 97 nercent by weicht will nass a 3 1/2 inch sieve and no more <br />than 20 percent dry weight shall wash through a No. 200 sieve. No visible clay <br />or oreanic matter will be permitted. <br />3. PLACEMENT OF MATERIAL <br />A. After the subgrade is completed and approved, the Contractor shall furnish <br />and spread the coquina shell in a uniform distribution. Spread thickness shall <br />be a minimum of 9 inches. Segregated areas of fine or course rock will not he <br />permitted. Such areas shall be removed and replaced with properly graded <br />rock. <br />B. After the spreading is completed, the entire surface shall be scarified and <br />shaped so as to produce the required grade and cross section after <br />3 compaction. <br />4. COMPACTION <br />i_ <br />A. The required compaction of the coquina shell base course shall be a minimum <br />of 98 nercent of the maximum dry density. <br />S B. No less than 8- 10 ton steel drum or pneumatic tired roller shall be used to <br />compact the base course. All depressions shall be filled and the process of <br />rolling and filling shall continue until a thoroughly compacted uniform <br />surface is produced. During final compaction operations, if biading of any <br />area is necessary to obtain the true grade and cross section, the compactio., <br />operations for SUCK areas uiiaii v wiiipifa1d priv'i iv tnaniiib i 1 L.—'ua.1—j- <br />compaction test on the finished base. <br />C. Should the subgrade material become mixed with the base course material at <br />any time, the Contractor shall remove the mixture, reshape and recompact <br />the subgrade, replace the materials removed with additional coquina shell and <br />reshape and recompact the coquina shell base at no cost to the Owner. <br />02:10}. 1
The URL can be used to link to this page
Your browser does not support the video tag.