Laserfiche WebLink
s <br />11 <br />D. If cracks or checks appear in the base which would impair the structural <br />integrity of the base lin the opinion of the Engineer, the Contractor shall <br />1 remove the cracks or checks by rescarifying, reshaping, refilling with coquina <br />shell where necessary, and recompacting at no cost to the Owner. <br />E. The finished coquina shell base shall be checked for thickness at intervals of <br />F not more than 300 feet. Any areas which are less than 5 1/2 inches in thickness <br />shall be corrected by scarifying and adding rock. The scarifying shall extend <br />for 50 feet either side of the deficient area. Areas which are less than 1/2 inch <br />deficient in thickness shall be corrected if the Engineer determines that the <br />area is extensive or may adversely affect the quality of the finished work. <br />6. PRIME COAT <br />A. The prime coat shall be a rapid curing liquid cut back asphalt equal or <br />equivalent to RC -70 or RC -250 at the Contractor's option, and conforming to <br />Sections 300 and 916-2 of the 1986 Edition of the Florida D.O.T. Standard <br />Specifications for Road and Bridge Construction. <br />B. The surface of the base material shall be cleaned after final compaction and <br />the moisture content of the base shall not exceed 90 percent of the optimum <br />11 'k vcluw uic priiiic Cvai i5 aptnlcu. 111U Priiilc I:vai auau uc apYucu <br />uniformly with a pressure distributor. The entire length of the spray bar shall <br />be set at the height above the surface recommended by the M: nufictu:rer for <br />even distribution. The prime coat shall be applied to the finished base course <br />at the rate of 0.15 gallons per square yard at a temperature between 100o F. <br />to 1500 F. The prime coat shall be applied such that a period of no longer <br />than two (2) hours lapse prior to application of the asphaltic concrete wearing <br />course, unless the prime coat is covered with sand or screenings as outlined in <br />Section 300-6.5 of tile 1906 Edition of the FloridaD.O.T. Specifications. <br />7. TESTING <br />A. The maximum density and optimum moisture shall be determined in <br />accordance with the Modified Proctor Test procedures of ASTM -D1557 or <br />AASHTO- f 180 (Method D). The percentage compaction and in-place <br />density shall be determined according to procedures of ASTM -D2167 "Test <br />for Density of Soil In -Place by the Rubber Balloon Method" or the nuclear <br />method ASTM- D2922. In general, one Modified Proctor 'fest per 300 lineal <br />feet of roadwork shall be performed on a representative sample of base <br />aler-M esignated by the Engineer. 11n, pkace densilY <br />testing shall.be pertbrmeduat' the rate of one test per 300 lineal feet of <br />roadwork at comparable locations unless otherwise specified by the Engineer. <br />02304-2