My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177 A
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177 A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2023 1:44:09 PM
Creation date
11/13/2023 1:42:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177A
Entity Name
Summit Construction Management, Inc.
Subject
Dale Wimbrow Park Improvements
Project Number
9625B
Bid Number
9061
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. The Owner may, at any time by a written order and without notice to the sureties, <br />require the performance of such extra work as it may find necessary or desirable <br />arising out of the modification of the Contract Drawings. All work so ordered must <br />j be performed by the Contractor. The amount of compensation to be paid to the <br />Contractor for any work so ordered shall be determined as follows: <br />1) By such applicable unit prices, if any, as are set forth in the Contract; or <br />2) If no such unit prices are so set forth, then by a lump sum or other unit prices <br />mutually agreed upon by the Owner and Contractor; or <br />3) If no such unit prices are so set for in the contract and if the parties cannot <br />agree upon a lump sum or other unit prices, then by the actual net cost in <br />i money to the Contractor of the extra work performed and the cost shall be <br />i.. determined as follows: <br />i <br />a. For all labor and foremen (Contractors and subcontractors) in direct <br />charge of the authorize operations, the Contractor shall receive the <br />current local rate of wages, to be agreed upon in writing before starting <br />such work, for each hour that said labor and foremen are actually <br />I engaged thereon, to which shall be added an amount equal to 15 <br />percent (15%) of the sum thereof which shall be considered and <br />i accepted as full compensation for general supervision and the <br />j furnishing of small tools and miscellaneous equipment used, such as <br />picks, shovels, hand pumps, and similar items. <br />R- b. For all materials used (by Contractor or subcontractor), the Contractor <br />shall receive the actual cost of such materials delivered at the site or <br />I previously approved delivery point as established by original receipted <br />I bills. No percentage shall be added to this cost. <br />C. For special equipment and machinery (used by Contractor or <br />subcontractor) such as power driven pumps, concrete mixers, trucks, <br />and tractors, or other equipment required for the economical <br />performance of the authorized work, the Contractor shall receive <br />payment based on the agreed rental price for each item of equipment <br />and the actual time of its use on the work. No percentage shall be <br />added to this sum. <br />d. The Contractor's profit shall be computed by taking ten (10%) percent <br />of the sum of items 3( a) (less the 15% added) and 3(b) above. <br />The total cost of performing this extra work shall then be the sum of <br />items 3( a), 3(b), 3(c), and 3(d). <br />I <br />GC -6
The URL can be used to link to this page
Your browser does not support the video tag.