My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177 A
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177 A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2023 1:44:09 PM
Creation date
11/13/2023 1:42:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177A
Entity Name
Summit Construction Management, Inc.
Subject
Dale Wimbrow Park Improvements
Project Number
9625B
Bid Number
9061
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />f <br />May 25, 1999 <br />t <br />sedimentation, the Contractor shall repair or replace the item with no additional compensation. All <br />new and existing (where called for) storm sewer pipes shall be clean and free from silt prior to final <br />acceptance. <br />The Contractor shall maintain stormwater runoff during construction so that flooding does not occur. <br />The Indian River Fames Water Control District has jurisdiction of the Oslo Road Sub -Lateral B -7-E <br />Canal. The Contractor shall coordinate the work with the County. <br />ftm 4f Paymen4 <br />Payment for the work specified in this item shall be made under: <br />Erosion and Water Pollution Control Lump Sum <br />LE RIN-AND GRUBBiN <br />The work specified in this item shall conform to Section 1 10 of the Florida Department of Transportation <br />Standard Specifications for Road and Bridge Construction. (Latest Edition) with the following modifications: <br />Prior to any clearing and grubbing, the contractor will stake the right-ot=way. Unimproved areas shall be <br />cleared of trees, logs, stumps, brush, vegetation, rubbish and other perishable or objectionable matter within <br />limits shown on the plans excepting for certain trees and shrubs shown on the plans or as directed by the <br />ENGINEER which are to remain undisturbed and protected. Stumps and roots between slope stakes in cuts <br />and in embankments 3 feet or less in depth shall be removed to a depth of 18 inches below subgrade. No <br />stumps, roots, or perishable matter of any description shall remain under concrete slabs or footing, including <br />pavement and sidewalks. <br />No trees shall be r,:moved or relocated until the ENGINEER or his representative has marked all trees to <br />be saved, after a review of the project site with the Contractor's representative. <br />Where the fin.•d pavement or structural work will be close to existing trees, the Contractor shall exercise care <br />in the vicinity of the trees. Further, the Contractor shall saw cut along the edge of the outside limits of the <br />stabilization, structure subgrade or sidewalk to a minimum depth of 18 inches below the finish grade and <br />paint with a commercial grade pruning paint the ends of all sawn roots. If directed by the ENGINEER or <br />where shown on the drawings, work shall be done " by hand" in order to protect the trees. <br />SP -7
The URL can be used to link to this page
Your browser does not support the video tag.