Laserfiche WebLink
40 <br />f <br />May 25, 1999 <br />t <br />sedimentation, the Contractor shall repair or replace the item with no additional compensation. All <br />new and existing (where called for) storm sewer pipes shall be clean and free from silt prior to final <br />acceptance. <br />The Contractor shall maintain stormwater runoff during construction so that flooding does not occur. <br />The Indian River Fames Water Control District has jurisdiction of the Oslo Road Sub -Lateral B -7-E <br />Canal. The Contractor shall coordinate the work with the County. <br />ftm 4f Paymen4 <br />Payment for the work specified in this item shall be made under: <br />Erosion and Water Pollution Control Lump Sum <br />LE RIN-AND GRUBBiN <br />The work specified in this item shall conform to Section 1 10 of the Florida Department of Transportation <br />Standard Specifications for Road and Bridge Construction. (Latest Edition) with the following modifications: <br />Prior to any clearing and grubbing, the contractor will stake the right-ot=way. Unimproved areas shall be <br />cleared of trees, logs, stumps, brush, vegetation, rubbish and other perishable or objectionable matter within <br />limits shown on the plans excepting for certain trees and shrubs shown on the plans or as directed by the <br />ENGINEER which are to remain undisturbed and protected. Stumps and roots between slope stakes in cuts <br />and in embankments 3 feet or less in depth shall be removed to a depth of 18 inches below subgrade. No <br />stumps, roots, or perishable matter of any description shall remain under concrete slabs or footing, including <br />pavement and sidewalks. <br />No trees shall be r,:moved or relocated until the ENGINEER or his representative has marked all trees to <br />be saved, after a review of the project site with the Contractor's representative. <br />Where the fin.•d pavement or structural work will be close to existing trees, the Contractor shall exercise care <br />in the vicinity of the trees. Further, the Contractor shall saw cut along the edge of the outside limits of the <br />stabilization, structure subgrade or sidewalk to a minimum depth of 18 inches below the finish grade and <br />paint with a commercial grade pruning paint the ends of all sawn roots. If directed by the ENGINEER or <br />where shown on the drawings, work shall be done " by hand" in order to protect the trees. <br />SP -7