My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177 A
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177 A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2023 1:44:09 PM
Creation date
11/13/2023 1:42:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177A
Entity Name
Summit Construction Management, Inc.
Subject
Dale Wimbrow Park Improvements
Project Number
9625B
Bid Number
9061
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />May 25, 1999 <br />GRAD ING• EXCA CATION, EMBANKMENT <br />The work specified in this item shall conform to Section 1?0 of the Florida Department of Transportation <br />Specifications for Road and Bridge Construction. (Latest Edition). Excess fill removed to be delivered to <br />Indian River County to a site designated by the County Engineer. <br />This item shall include all excavation of whatever kind, including subsoil, if necessary, for the roadway, <br />drai-age channels, removal of existing pavement, structures and any other work normally included in Section <br />120-7. Also included is all work necessary to construct all necessary embankments, including compaction <br />of same, normally included in Section 120-5 & 120-9. Grading of swales and the construction of all earth- <br />work necessary to achieve the final elevations, lines, grades and contours shown on the plans shall be included <br />in this item. No other additional payment will be made for any earthwork, grading or excavation. <br />I1gtL 9 Payment <br />Payment for the work specified in this item shall be made under: <br />E <br />Grading, Excavation & Embankment Lump Sum <br />STABILIZATION - TYPE 'C'(6- St BGRADE) <br />Contractor shall include a unit price for subgrade preparation. The ENGINEER'S sole discretion will <br />determine the location of subgrade preparation used in the Project. <br />The work specified in this item shall conform to Section 160 of the Florida Department of Transportation <br />Specifications for Road and Bridge Construction (Latest Edition) as modified herein. No base will be <br />constructed until density tests, as directed by the ENGINEER, show the specified values have been attained. <br />The subgrade shall be stabilized to the depth shown in the plans and/or itemized proposal. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Stabilized sub -grade (6") Square Yard <br />LIMEROCK BASE COURSE <br />Article 200-10 Calculations for average thickness of base. Delete this article in its entirety. <br />Article 200-11 Method of Measurement. Delete the text of this article and substitute the fbllowing: <br />SP -9
The URL can be used to link to this page
Your browser does not support the video tag.