My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177 A
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177 A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2023 1:44:09 PM
Creation date
11/13/2023 1:42:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177A
Entity Name
Summit Construction Management, Inc.
Subject
Dale Wimbrow Park Improvements
Project Number
9625B
Bid Number
9061
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />May 25, 1999 <br />The calculations for Limerock Base to be paid for under this Section shall be the area in square yards of <br />Limerock, Base, completed and accepted with the length to be used in the calculations being the actual length <br />measured along the surface of the base and the width of the wearing surface as called for on the plans even <br />t though the base shall extend beyond the limits of the wearing surface, as specified on the Plans. The <br />thickness to be paid shall be as shown on the Typical Section in the plans. <br />i Article 200-12 Basis of Payment. Delete the text of this Article and substitute the following. <br />The quantity of Limerock Base, determined as provided above, shall be paid for at the contract price per <br />square yard for Limerock Base, completed and accepted which price and payment shall be full compensation <br />for furnishing, hauling and placing all materials, and for correcting all defective surface and deficient <br />thickness. <br />tem of Payment <br />Payment for the work specified in this item shall be made under: <br />Limerock Base Square Yard <br />PRIMEANS T CICWATa <br />All prime and tack materials as identified in the Latest Edition of the FDOT (toad and Bridge Specifications <br />and 1996 Supplement may be used. Article 300-9 Basis of Payment (Page 189) is deleted and the following <br />substituted: The quantities to be paid for under this Section shall be included in the cost of the following <br />contract items: <br />1. Prime Coat - included in "Base" Pay Item. <br />2. Tack Coat - included in "Asphaltic Concrete" Pay Item <br />3. Bituminous Material (Plant Mix) (asph. cem. 20/30) - to be included in Asphaltic Concrete. <br />TYPE S ASPHALTIC CONCRETE <br />The work specified in this item shall conform to Section 331 of the Florida Department of Transportation <br />Standard Specifications for Road and Bridge Construction. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Type S -I Asphaltic Concrete Square Yard <br />Included in this payment will be tack coat and bituminous materials (Plant Mix). No separate payment will <br />be made for bituminous materials. <br />SP -10
The URL can be used to link to this page
Your browser does not support the video tag.