Laserfiche WebLink
40 <br />May 25, 1999 <br />The calculations for Limerock Base to be paid for under this Section shall be the area in square yards of <br />Limerock, Base, completed and accepted with the length to be used in the calculations being the actual length <br />measured along the surface of the base and the width of the wearing surface as called for on the plans even <br />t though the base shall extend beyond the limits of the wearing surface, as specified on the Plans. The <br />thickness to be paid shall be as shown on the Typical Section in the plans. <br />i Article 200-12 Basis of Payment. Delete the text of this Article and substitute the following. <br />The quantity of Limerock Base, determined as provided above, shall be paid for at the contract price per <br />square yard for Limerock Base, completed and accepted which price and payment shall be full compensation <br />for furnishing, hauling and placing all materials, and for correcting all defective surface and deficient <br />thickness. <br />tem of Payment <br />Payment for the work specified in this item shall be made under: <br />Limerock Base Square Yard <br />PRIMEANS T CICWATa <br />All prime and tack materials as identified in the Latest Edition of the FDOT (toad and Bridge Specifications <br />and 1996 Supplement may be used. Article 300-9 Basis of Payment (Page 189) is deleted and the following <br />substituted: The quantities to be paid for under this Section shall be included in the cost of the following <br />contract items: <br />1. Prime Coat - included in "Base" Pay Item. <br />2. Tack Coat - included in "Asphaltic Concrete" Pay Item <br />3. Bituminous Material (Plant Mix) (asph. cem. 20/30) - to be included in Asphaltic Concrete. <br />TYPE S ASPHALTIC CONCRETE <br />The work specified in this item shall conform to Section 331 of the Florida Department of Transportation <br />Standard Specifications for Road and Bridge Construction. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Type S -I Asphaltic Concrete Square Yard <br />Included in this payment will be tack coat and bituminous materials (Plant Mix). No separate payment will <br />be made for bituminous materials. <br />SP -10