My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177 A
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177 A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2023 1:44:09 PM
Creation date
11/13/2023 1:42:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177A
Entity Name
Summit Construction Management, Inc.
Subject
Dale Wimbrow Park Improvements
Project Number
9625B
Bid Number
9061
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4b <br />i <br />i. Approved -b-y- Engineer: In no case releases Contractor <br />from responsibility to fulfill requirement of the <br />j Contract Documents. <br />j. Project Site: Space available to Contractor at location <br />of project, either exclusively or to be shared with <br />separate contractors, for performance of the work. <br />k. Furnish: Supply and deliver to project site, ready for <br />unloading, unpacking, assembly, installation, and <br />similar subsequent requirements. <br />1. Project Manual: As used in these Contract Documents <br />includes the Bidding requirements, Conditions of the <br />Contract, and the Specifications. <br />m. Product: As used in these Contract Document includes <br />materials, systems, and equipment. <br />Fl. install: operations at project site, includingcunloading, unpacking, assembly, erection, placing, <br />anchoring, applying, working to dimension, finishing, <br />I <br />f <br />curing, protecting, cleaning and similar requirements. <br />o. Provide: Furnish and install, complete and ready for <br />t <br />intended use. <br />l P. Installer: Entity (firm or person) engaged to install <br />work, by Contractor, subcontractor or sub -subcontractor. <br />I Installers are required to be skilled experts in work <br />j, they are engaged to install. <br />f q. Overlapping/Conflicting Requirements: Most stringent <br />requirements apply and will be enforced, unless more <br />detailed language written directly into Contract <br />Documents clearly indicates that a less stringent <br />requirement is acceptable. Where optional requirements <br />are specified in a parallel manner, option is intended <br />to be Contractor's unless otherwise indicated. <br />r. Minimum Requirements: Indicated requirements are for a <br />specific minimum acceptable level of quality/quantity, <br />as recognized in the industry, <br />i S. The term "or equal" where used in the Project Manual <br />shall in all cases mean approved equal as determined byItheCountyEngineer. <br />201010
The URL can be used to link to this page
Your browser does not support the video tag.