My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177 A
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177 A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2023 1:44:09 PM
Creation date
11/13/2023 1:42:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177A
Entity Name
Summit Construction Management, Inc.
Subject
Dale Wimbrow Park Improvements
Project Number
9625B
Bid Number
9061
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
j conditions of variations in color and texture. <br />Submit full documentation with each set. Except as <br />i other wise indicated, sample submittals are for the <br />County Engineer's observation of color, texture, <br />pattern and "kind", as applicable. Maintain <br />returned set at project site, for purpose of quality <br />control comparisons. <br />2.02 SUBSTITUTIONS <br />E <br />I A. Approval Required: <br />1. The Contract is based on the standards of <br />f quality established in the Contract Documents. <br />2. All products proposed for use, including those <br />specified by required attributes and perform- <br />ance, shall require approval by the Architect <br />and the Engineer before being incorporated into <br />the work. <br />3. Do not substitute materials, equipment or <br />methods unless such substitutlun has been <br />specifically approved for this work by the <br />Architect and the Engineer, in writing. <br />s <br />i <br />B. "Or Equal": <br />1. Where the phrase "or equrl" or "or equal as <br />approved by the Architect and Engineer" occurs <br />i in the Contract Documents, do not assume that <br />i materials, equipment or methods will be approved <br />as eaual unless the item has been specifically <br />approved in writing by the Architect and the <br />Engineer. <br />2. The decision of the Engineer shall be final. <br />END OF SECTION <br />01300-2 <br />r,
The URL can be used to link to this page
Your browser does not support the video tag.