My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177 A
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177 A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2023 1:44:09 PM
Creation date
11/13/2023 1:42:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177A
Entity Name
Summit Construction Management, Inc.
Subject
Dale Wimbrow Park Improvements
Project Number
9625B
Bid Number
9061
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />A. <br />DIVISION 1 <br />SECTION 01300 <br />I <br />SUBMITTALS <br />processing of submittals requiring review and <br />PART 1 GENERAL <br />F <br />plete record or submittals. Provide copies required <br />e 1.01 GENERAL <br />The provisions of this section apply to required <br />submittals, related to units of work, not to <br />B. <br />administrative submittals such as payment requests, <br />I insurance certificates and progress reports. In <br />addition to specific provisions of General and <br />Supplementary Conditions related to submittals, <br />individual specification sections of Divisions 2 <br />C. <br />through 10 contain submittal requirements, specific <br />requirements in other sections have precedence over <br />general requirements of this section. <br />PART 2 PRODUCTS <br />2.01 PROCEDURAL REQUIREMENTS. <br />A. General: Coordinate submittals with progress <br />schedule and actual progress of work; allow ten (10) I working days for Architect's and Engineer's <br />processing of submittals requiring review and <br />approval. Use transmittal form to establish com- <br />plete record or submittals. Provide copies required <br />by governing authorities, which are in addition to <br />copies specified for submittal to the Architect and <br />Engineer. <br />B. Copies of Shop Drawings: Submit four copies. Copies <br />will be reviewed, marked and returned. Contractor <br />shall make adequate copies for distribution to field <br />and subcontractors as necessary. Maintain one set <br />as mark-up copy for record drawings. <br />C. Copies of Product Data: Mark each copy to indicate <br />actual product to be provided; show selections from <br />among options in manufacturer's printed product <br />data. Submit five copies; two copies of which will <br />be returned where required for maintenance manuals; <br />and an additional copy to be maintained at project <br />site for reference purposes. Do not proceed with <br />installation of manufactured products until a copy <br />of related product data is in Installer's <br />possession. <br />D. Set of Samples: Submit two sets; one set will be <br />returned. Show average condition and extreme <br />01300-1
The URL can be used to link to this page
Your browser does not support the video tag.