Laserfiche WebLink
2.09 LOCKUP AND SECURITY <br />6 As construction of building structure or shell <br />progresses and it becomes feasible to secure project <br />against intrusion, provide temporary security <br />l enclosure, doors and locks as necessary to prevent <br />unauthorized entrance. Deliver, store and lockup <br />materials and equipment in a manner which will <br />prevent theft and vandalism. <br />i_ 2.10 ENVIRONMENTAL PROTECTION <br />I Review exposure to possible environmental problems, <br />with Owner and Engineer. Establish procedures and <br />discipline among tradesmen and provide needed <br />facilities which will protect against environmental <br />problems (pollution of air, water and soil, <br />excessive noise, and similar problems). <br />I PAPT Z ice' i r,i <br />3.01 GENERAL <br />r_ <br />A. Comply with applicable requirements specified in <br />Division 15 - Mechanical, and in Division 16 - <br />Electrical. <br />f B. Maintain and operate systems to assure.continuous <br />5 <br />service. <br />i. C. Modify and extend systems as work progress requires. <br />3.02 REMOVAL <br />A. Completely remove temporary materials and equipment <br />when their use is no longer required. <br />B. Clean and repair damage caused by temporary <br />installations or use of temporary facilities. <br />PART 4 - ITEM OF PAYMENT: <br />No separate Payment shall be made for work specified <br />in this Section; Payment for work specified in this <br />Section shall be included in Payment made for other <br />Sections. <br />END OF SECTION <br />01500-3