Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177A
Entity Name
Summit Construction Management, Inc.
Subject
Dale Wimbrow Park Improvements
Project Number
9625B
Bid Number
9061
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
do <br />0 <br />E. Fill material, below floor slabs and footings and wheree <br />required to bring areas up to grade as indicated, shall be <br />clean, "approved", bank -run sand, installed in 12" lifts <br />and mechanically compacted to 98% of maximum bulk density <br />at the optimum moisture content as determined by AASO T- 180. A test report is required, submitted to the Archi- <br />tect for approval, prior to slab and .footing concrete <br />pours. <br />i... F. The Contractor shall take care not to damage any existingtreesbeyondthelimitsof construction and shall replace <br />any and all landscaping damaged by him, at no cost to the <br />Owner. <br />I. <br />G. The Contractor shall check with the appropriate local gov- <br />erning agencies to ascertain the location of all under- <br />ground lines and/or utilities and he shall take the neces- <br />sary precautions/care not to damage them. The Contractor <br />shall repair any and all damage to underground lines. at <br />his cost, it same were located for him prior to .the <br />beginning of construction. <br />END OF SECTION*** <br />1.. <br />I <br />02110-1 <br />SECTION 02110 - SITE CLEARING <br />A. The Contractor shall be responsible for site preparation <br />in accordance with the Architectural Site Plans. <br />B. The Contractor is responsible for the stripping top soilandtheremovaloforganicdebrisfromallareasbelowfloorslabsandwalkways. All useable fill and/or topsoilaccumulatedistoremainthepr.;.-)perty of the Owner. <br />Stock pile additional fill and Owner will be responsibleforitsremoval. <br />C. The Contractor is to excavate the subgrade to the levels <br />required for footings, slabs, walkways and paving. <br />t, D. The building areas shall be grade level and compacted with <br />a vibratory roller that exerts a dynamic load of no less <br />than 10 tons. Any soft, yielding areas shall be excavated <br />and replaced with clean, compacted fill. Sufficient <br />passes are to be made s3uring proofrolling to produce adensityofnolessthan95% of the modified Proctor value <br />to a depth of two (2) feet. A test report is required, <br />submitted to the Architect for approval, prior to the <br />placement and compaction of additional fill material and <br />any slab/footing concrete pours. <br />E. Fill material, below floor slabs and footings and wheree <br />required to bring areas up to grade as indicated, shall be <br />clean, "approved", bank -run sand, installed in 12" lifts <br />and mechanically compacted to 98% of maximum bulk density <br />at the optimum moisture content as determined by AASO T- 180. A test report is required, submitted to the Archi- <br />tect for approval, prior to slab and .footing concrete <br />pours. <br />i... F. The Contractor shall take care not to damage any existingtreesbeyondthelimitsofconstructionandshallreplace <br />any and all landscaping damaged by him, at no cost to the <br />Owner. <br />I. <br />G. The Contractor shall check with the appropriate local gov- <br />erning agencies to ascertain the location of all under- <br />ground lines and/or utilities and he shall take the neces- <br />sary precautions/care not to damage them. The Contractor <br />shall repair any and all damage to underground lines. at <br />his cost, it same were located for him prior to .the <br />beginning of construction. <br />END OF SECTION*** <br />1.. <br />I <br />02110-1