My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177 A
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177 A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2023 1:44:09 PM
Creation date
11/13/2023 1:42:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177A
Entity Name
Summit Construction Management, Inc.
Subject
Dale Wimbrow Park Improvements
Project Number
9625B
Bid Number
9061
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />P` <br />i <br />SECTION 02200 - EARTHWORK <br />PART 1 - GENERAL <br />See also Work by County Forces) in General <br />f' Conditions. <br />i <br />1.01 DESCRIPTION <br />A. Work Included: <br />1. Excavation and disposal of excess material. <br />2. Filling and compaction. <br />3. Grading and fine grading. <br />i <br />4. Incidental earthwork. <br />1.02 QUALITY ASSURANCE <br />r <br />A. Requirements of Regulatory Agencies: <br />1. Comply with State and Local laws and codes in <br />disposal of trees, shrubs and other material. <br />B. Testing Agency: <br />1. The Owner has retained a soils engineer who will <br />monitor construction of fills and embankments <br />and initial tests. All retests required <br />F. resultinq from failure of the initial tests will <br />be paid for by the Contractor. <br />f <br />PART 2 - PRODUCTS <br />2.01 MATERIALS <br />f <br />j A. Excavated Material: On-site, or imported as <br />necessary, material meeting the following.: <br />1. Homogeneous, compactable, generally granular <br />I soil free of organics, and muck. <br />2. Use of on --site material must be approved by the <br />soils engineer. <br />PART 3 - i EXECUTION <br />3.01 PREPARATION <br />f <br />k. A. After the work of clearing and grubbing, accurately <br />perfcrm all construction layout. <br />B. Before excavation: <br />1. Verify layout, horizontal and vertical, and con- <br />formance of layout with Contract Drawings. <br />2. Verify Limits of Construction. <br />3. Accurately survey and record the location of <br />property monuments bench marks, USGS Monuments, <br />ROW markers which may be moved by the Con- <br />tractor's operations. Use licensed land <br />surveyor only. All property monuments, ASGS <br />Monuments and ROW markers moved, shall be <br />replaced by a licenses land surveyor. <br />L: <br />e <br />02200-1
The URL can be used to link to this page
Your browser does not support the video tag.