My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177 A
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177 A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2023 1:44:09 PM
Creation date
11/13/2023 1:42:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177A
Entity Name
Summit Construction Management, Inc.
Subject
Dale Wimbrow Park Improvements
Project Number
9625B
Bid Number
9061
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />6 <br />A. Structures shall rest on firm, undisturbed earth or <br />on structural fill compacted to 98% modified proctor <br />maximum density as determined by AASHTO T-180. <br />1. If excavations are below the elevation shown on <br />the drawings, the Contractor, at his own <br />expense, shall fill the void thus made to the <br />proper grade with structural fill. <br />F <br />END OF SECTION*** <br />t. <br />02200-2 <br />4. Verify utility locations, whether shown on <br />drawings or not, including, but not limited to <br />aerial, pole line, buried, underground, trans- <br />mission, local service and individual connec- <br />tion. Prior to excavation notify gas and oil <br />pipeline company owners, if any, and other <br />utility companies in. accordance with FL 77-153. <br />3.02 <br />i <br />EXCAVATION <br />A. Perform all excavations to the elevations required, <br />t: indicated on Contract Drawings or as specified. <br />1. Excavation is unclassified and includes rock, <br />muck, and all other materials of whatever nature <br />encountered on the site. <br />2. Use any excavation method except blasting or use <br />of explosives. <br />B. Excavated material from the site may be used for <br />embankments and fills, provided that it meets the <br />requirements of this Section, Part 2. Dispose of <br />all other material off-site at a location acceptable <br />to the Owner. <br />3.03 DEWATERING <br />A. Keep the site free of surface water accumulations. <br />Construct temporary drainage ditches and dikes to <br />divert rainwater away from areas important to keep <br />dry. Pump and perform any other work to remove <br />t water from excavations. <br />f . <br />B. Construct, operate and maintain dewatering facili- <br />ties to lower and maintain groundwater level at <br />least two feet below the foundation excavation. <br />1. Construct trenches, provide and operate well <br />point systems, pumps, sumps and any other means <br />to lower and maintain the groundwater level. <br />3.04 EXCAVATION FOR STRUCTURES AND BACKFILL AROUND <br />STRUCTURES <br />A. Structures shall rest on firm, undisturbed earth or <br />on structural fill compacted to 98% modified proctor <br />maximum density as determined by AASHTO T-180. <br />1. If excavations are below the elevation shown on <br />the drawings, the Contractor, at his own <br />expense, shall fill the void thus made to the <br />proper grade with structural fill. <br />F <br />END OF SECTION*** <br />t. <br />02200-2
The URL can be used to link to this page
Your browser does not support the video tag.