1999-177 A
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177 A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2023 1:44:09 PM
Creation date
11/13/2023 1:42:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177A
Entity Name
Summit Construction Management, Inc.
Subject
Dale Wimbrow Park Improvements
Project Number
9625B
Bid Number
9061
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C] <br />r <br />i SEC'T'ION 02202 <br />EXCAVATION1. SCOPE <br />1 A. The Contractor shall furnish all necessary labor, equipment, and <br />transportation to excavate and haul material in accordance with the flans and <br />Specifications. <br />2. GENERAL <br />A. The Contractor shall excavate for the roadways, structures, swales, etc., as <br />shown on the Drawings and specified herein, and shall dispose of all materials <br />excavated at a site designated or approved by the Owner. <br />3. DISPOSAL. <br />A. In all areas where excavation is to be done, all earth, rock, muck and other <br />materials shall be removed and separated as to suitable and unsuitable <br />material for backfill as defined herein. <br />B. The Contractor may, for his own convenience, elect to temporarily stockpile <br />any portion of the excavated material at a job site location designated by the <br />Owner, for later use or disposal. The stockpiled material shall be piled in an <br />orderly manner so as not to endanger the work or obstruct roadways or <br />drainage within the designated job site location. All excavated unsuitable <br />t material shall be disposed of at a location designated or approved by the <br />Owner. All excavated suitable material that is not reused _by the Contractor <br />within the job site shall become the property of the Owner and shall be <br />i disposed of as directed by the Owner. <br />d. SHEETING AND BRACING <br />A. Where excavations may endanger workmen, existing structures, utilities or <br />other facilities, it shall be the Contractor's responsibility to immediately install <br />and maintain adequate sheeting and bracing per OSHA specifications in <br />order to protect said facility. No work shall proceed in such excavations until <br />the sheeting and bracing has been properly and completely installed. The <br />sheeting thus installed shall be removed as the work progresses or, at the <br />discretion of the Engineer, be cut off below finished grade and left in place. <br />i . Sheeting and bracing may be either steel or wood at the option of the <br />Contractor. <br />B. Sheeting and bracing shall be installed in a manner that will allow for removal <br />without injuring or endangering workmen, the work, adjacent structures, and <br />the like. Voids caused by withdrawal of sheeting shall be prcnptly and <br />completely filled with sand and compacted to a degree equal to the <br />i surrounding soil. <br />5. DEWATERING <br />i <br />A. All water encountered during excavation shall be promptly and completely <br />removed to a depth below the exposed excavation surface sufficient to <br />provide a dry working surface. The excavation shall be kept dry until the work <br />02202-1