My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-245
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-245
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 3:30:34 PM
Creation date
11/16/2023 3:22:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/21/1999
Control Number
1999-245
Entity Name
Sheltra & Son Construction
Subject
Contract and Bid Award for Shooting Range Site Work
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E-1 <br />S'ECT10N 573 - HYDRO -SEEDING <br />573-1 Description <br />The work specified in this Section shall consist of all materials, labor, equipment, and <br />supervision necessary to apply a slurry of seed, fertilizer, and mulch to establish a healthy <br />stand of grass. All sloped areas, such as berms, swales, and banks shail be grassed by <br />hydro -seeding. <br />573-2 Materials <br />The type and quantity of grass seed shall be as spPofied in Index 1x14 of the F,D.UT.D.S. <br />and shall conform to the requirements of Section 98'1 of the F,D.O.T.S.S.. <br />Tire mulct -1 snail be a wood cellulosu fiber especially prepared for use in hydro -seeding, <br />such as the material supplied by Terra -Mulch (800) 72.6-6414 and shall be applied in the <br />slurry mixture at the rates recommended by the manufacturer for the slopes being <br />covered. <br />The fertilizer shall conform to the requirements of vection 982 of the F.D.O.T.S.S., and <br />shall be applied in the slurry mixture at a rate of 1000 pounds per acra. <br />573,3 Construction Methods <br />The proportions of seed„ mulch, and fertilizer shall be mixed with water and other <br />appropriate components, such as time tacking agents and growth stimulants, and be <br />applied vr{th equipment specifically designed for mixing and applying the slurry. Thiu slurry <br />shall be uniformly applied over the area being covered and provide the specified rates of <br />application. Worst shall be accordance with the directions of the hydro -seeding equipment <br />manufacturer, and the material supplier. <br />573-4 Basis of Payment <br />Work and incidental costs specified as being coverod under this Section will be paid for <br />at the contract unit price for the quantities satisfactorily completed and accepted. <br />Payment shall be made under: <br />Item No. 573-1 hlydro-Seeding (Bahia) - Per Square Yard <br />The above price and payment shall constitute full compensation for all work described in <br />Section 575 incivaing the cost of tertilizing, seeding, mulching, watering, and complete <br />maintenance of the sodded areas until accepted by the County. <br />SECTION 575 - SODDING <br />575-1 Dascription <br />The work specified in this section shall conform to Section 575 of the F.0.0.T.S.S.. <br />675.5 Basis of Payment <br />Work and Incidental costs specified as being covered under this Section will be paid for <br />TECrrNICAL SPECIFXCIMONS <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.