My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-245
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-245
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 3:30:34 PM
Creation date
11/16/2023 3:22:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/21/1999
Control Number
1999-245
Entity Name
Sheltra & Son Construction
Subject
Contract and Bid Award for Shooting Range Site Work
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />16.5. Owner reserves the right to reject the Bid of any Bidder who does not pass <br />l any such evaluation to Owner's satisfaction. <br />1&6. If the contract is to be awarded, it will be awarded to the lowest responsive, <br />I responsible Bidder on the basis of the Total Base Bid. <br />16.7, if the contract is to be awarded, Owner will give the Successful Bidder a <br />Notice of Award within sixty days after the day of the Bid opening. <br />17. BY&fLns�J1��� �?�3ef��r7Si`t <br />Paragraph 5.1 of the General Conditions and the Supplementary Conditions set <br />forth Owner's requirements as to performance and payment Bonds. When the <br />successful Bidder delivers the executed Agreement to Owner it shall be <br />accompanied by the required Contract Security, unless the Bonds have been <br />waived due to the total contract being less than $50,000. <br />18, la r AatioT]�4f lh A_pPr9ximate entiti s <br />The Bidder's attention is called to the tact that any estimate of quantities of work to <br />be done and materials to be furnished under the Specifications as shown on the Bid <br />Schedule, or elsewhere, is approximate only and not guaranteed. The Owner does <br />not assume any responsibility that the final quantities shall remain in strict <br />accordance with the estimated quantities, nor shall the Contractor plead <br />misunderstanding or deception because of such estimate of quantities or of the <br />character, location of the work, or other conditions pertaining thereto. <br />The Bidder to whom the Contract is awarded shall, within ten (10) days of the <br />Notice of Award, execute and deliver five (5) copies of the following to the <br />Engineer: <br />a. Agreement <br />b. performance Bond(lf required) <br />c. Payment Bond(tf required) <br />C!, ryortif iraFo of <br />20_ FAIL r R rn rxrrtlTt L RACI <br />Should bidder to whom the contract has been awarded refuse or fail to complete <br />the requirements of Article 19 above within ten (10) days after Notice of Award, the <br />additional time in calendar days required to correctly complete the documents will <br />be deducted, in equal amount, from the Contract time, or the County may elect to <br />revoke Bid Bond of any Bidder failing to execkste the awarded Contract shall be held <br />by the County for consequential damages incurred, and the Contract awarded as <br />the Commission desires. <br />INSTRUCTIONS TO BIDDERS <br />! , IB -7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.