Laserfiche WebLink
• <br />0 <br />ARI LK—;72_-[?REI.MNAHXM <br />Delivery of Bonds: <br />2.1 When CONTRACTOR delivers the executed Agreements to OWNER, CONTRACTOR <br />shall also deliver to OWNER such Bonds as CONTRACTOR may be required to furnish <br />in accordance with paragraph 5.1. <br />Copies of Documents: <br />2.2 OWNER shall furnish to CONTRACTOR up to ten copies (unless otherwise specified in <br />the SUpplementary Conditions) of the Contract Documents as are reasonably necessary <br />for the execution of the Work. Additional copies will be fumished, upon request, at the <br />cost of reproduction. <br />Commencement of Contract'rime; Notice to Proceed: <br />2.3 The Contract Time will commence to run on the day indicated in the Notice to Proceed. <br />A Notice to Proceed may be given at any time after the effective date of the Agreement. <br />In no event will the Contract Time commence to run later than the seventy-fifth (75) day <br />after the day of Bid opening. <br />Starting the Project: <br />2.4 CONTRACTOR shall start to perform the Work on the data when the Contract Time <br />commences to run, but no Work shall be done at the site prior to the date on which the <br />Contract Time commences to run. <br />Before Starting Construction: <br />2.5 Before undertaking each part of the Work, CONTRACTOR shall carefully study and <br />compare the CONTRACT Documents and check and verify pertinent figures shown <br />thereon and all applicable field measurements. CONTRACTOR shall promptly report in <br />writing to ENGINEER any conflict, error or discrepancy which CONTRACTOR may <br />discover and shall obtain a written interpretation or clarification from ENGINEER before <br />proceeding with any Work affected thereby; however, CONTRACTOR shall not be liabte <br />to OWNER or ENGINEER for failure to report any conflict, error or discrepancy in the <br />Contract Documents, unless CONTRACTOR had actual knowledge thereof or should <br />reasonably have known thereof. <br />2.5 Within ten (10) days after the Effective Cate of the Agreement (unless otherwise specified <br />tot iiie Guiimai Requirements), UUN t KAUTOR shall submit to ENGINEER for review: <br />2.6.1 an estimated progress schedule indicating the starting and completion dates of the <br />various stages of the Work; <br />2.6.2 a preliminary schedule of Shop Drawing submisslons; and <br />2.6.3 a preliminary schedule of values for all of the Work which will include quantities <br />and prices of items aggregating the Contract Price and will subdivide the Work into <br />component parts in sufficient detail to serve as the basis for progress payments <br />GENERAL CONDITIONS <br />GC — 4 <br />