My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-245
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-245
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 3:30:34 PM
Creation date
11/16/2023 3:22:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/21/1999
Control Number
1999-245
Entity Name
Sheltra & Son Construction
Subject
Contract and Bid Award for Shooting Range Site Work
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />during constfudon. Such prices will include an appropriate amount of overhead <br />and profit applicable to each item of Work which will bo confirmed in writing by <br />CONTRACTOR at the time of submission. <br />2.7 Ten (10) days prior to any work commencing, CONTRACTOR shall deliver to OWNER, <br />with a copy to ENGINEER, certificates (and other evidence of insurance requested by <br />OWNER) which CONTRACTOR is required to purchase and maintain in accordance with <br />Section 5. <br />Preconstruction Conference: <br />2.8 Within twenty (20) days after the Effective Date of the Agreement, but before <br />CONTRACTOR starts the Work at the site, a conference attended by CONTRACTOR, <br />ENGINEER and others as appropriate will be held to discuss they schedules referred to in <br />paragraph 2.6, to discuss procedures for handling Shop Drawings and other submittals <br />and for processing Applications for Payment, and to establish a working understanding <br />among the parties as to the Work. <br />Finalizing Schedules: <br />2.9 At least ten (10) days before submission of the first Application for Payment a conference <br />attended by CONTRACTOR, ENGINEER and others as appropriate will be held to finalize <br />the schedules submitted in accordance with paragraph 2.6. The finalized progress <br />schedule will be acceptable to ENGINEER as providing an orderly progression of the Work <br />to completion within the Contract Time, but such acceptance will neither impose on <br />ENGINEER responsibility for the progress or scheduling of the Work nor relieve <br />CONTRACTOR from frill responsibility therefor. The finalized schedule of Shop Drawing <br />submissions will be acceptable to ENGINEER as providing a workable arrangement for <br />processing the submissions. The finalized schedule of values will be acceptable to <br />ENGINEER as to form and substance. <br />ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE <br />Intent: <br />3.1 The Contract Documents comprise the entire agreement between OWNER and <br />CONTRACTOR concerning the Work. The Contract Documents are complementary; what <br />is called for by one is as binding as if called for by all. The Contract Documents will be <br />construed in accordance with the law of the place of the Project. <br />3.2 ii is inu inrenx of the Contract uocuments to describe a functionally complete Project (or <br />part thereof) to be constructed in accordance with the Contract Documents. Any Work, <br />materials or equipment that may reasonably be inferred from the Contract Documents as <br />teeing required to produce the intended result will be supplied whether or not specifically <br />called for. When words which have a well -know technical or trade meaning are used to <br />descrihe Work, materials or equipment, surlrw words shall be interpreted in accordance with <br />that meaning. 'Reference to standard specifications, manuals or codes of any technical <br />society, organization or association, or to the Laws or Regulations of any governmental <br />authority, whothor such reference be specific or by implications, shall mean the latest <br />standard specification, manual, code or Laws or Regulations in effect at the time of <br />opening of Bids (or, on the Effective Date of the Agreement if there were no Bids), except <br />as may be otherwise specifically stated. However, no provision of any referenced <br />GENEP AL CONDITIONS <br />GC - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.