Laserfiche WebLink
f <br />provided in paragraph 0.25 and repairing any damage thereto resulting from the <br />Work, the cost of all of which will be considered as having been included in the <br />Contract Price. <br />Utllities. <br />4.5 The word facility as used in this subsection titled "Utilities" includes any pipe conveying <br />gases or liquids and appurtenances attached thereto; cables, conduits, wires, ducts and <br />appurtenances; poles and appurtenances; any of which may be buried below grade or <br />installed at or above grade level. A facility excludes irrigation pipes, service connections <br />and traffic signal wiring, A service connection is a pipe (excluding irrigation pipes), cable, <br />wire, duct or conduit that is intended to connect a facility with a user. The word Utility as <br />used in this subsection titled "Utilities" refers to the entity having legal ownership of the <br />facility, service connection, irrigation pipe, or traffic signal wiring. <br />4.6 The ENGINEER has endeavored to date;mine the existence of underground facilities at <br />the site of the work from the records of the utilities with known facilities in the -vicinity of the <br />work, The position of these facilities as derived from such records are shown on the pfans. <br />Service connections, irrigation pipes, and traffic signal wiring may not be shown on the <br />plans. The CONTRACTOR shall make his own investigations, including exploratory <br />excavations and contact with Utilities, to determine the exact locations and type of existing <br />facilities, service connections, irrigation pipes, and traffic signal wiring prior to commencing <br />work in the area and shall be responsible for any damage thereto, <br />4.7 With regard to paragraph 6.25, damage, injury, or loss resulting in whole or in part from <br />the CONTRACTOR's failure to locate and preserve a facility, service connection, irrigation <br />pipe, or traffic signal wiring shall under no circumstances be deemed attributable to the <br />fault of the Drawings or Specifications or to the acts or omissions of the OWNER or <br />ENGINEER or anyone employed by either of them or anyone for whose acts either of them <br />may be liable. <br />4.8 With respect to underground facilities, no claim for a change in the contract price may be <br />allowed unless the CONTRACTOR discovers an underground facility which is not indicated <br />or referred to in the Contract Documents or which is in a position differing materially and <br />significantly from that indicated or referred to in the Contract Documents. If such discovery <br />is inade, the CONTRACTOR shall promptly notify in writing the OWNER, ENGINEER and <br />the Utility. The OWNER may make changes in the alignment and grade of the worts in <br />accordance with the section titled "Changes in the Work". <br />4.9 At no additional cost to the OWNER, the CONTRACTOR shall replace, remove, relocate, <br />protect, or temporarily maintain a facility which is not in a position diffPrimo !na!eriaiiā€ž anri <br />significantly from that indicated or referred to in the Contract Documents. At no additional <br />cost to the OWNER, the CONTRACTOR shall adjust the top elevation of all valve boxes <br />and manholes to match the finish grade or pavement surface and shall replace, remove, <br />relocate, protect, or temporarily maintain all service connections, irrigation pipes, and traffic <br />signal wiring. The work on the facility, service connection, irrigation pipe or traffic signal <br />wiring shall be done in a manner satisfactory to the Utility, it buing understood that the <br />Utility has the option of doing such work with his own forces, or permitting the work to be <br />done by the CONTRACTOR. <br />Reference Points: <br />4.10 OWNER shall provide engineering surveys to establish reference points for construction <br />GENF,RAL CONDITIONS <br />GC - 6 <br />