My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-245
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-245
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 3:30:34 PM
Creation date
11/16/2023 3:22:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/21/1999
Control Number
1999-245
Entity Name
Sheltra & Son Construction
Subject
Contract and Bid Award for Shooting Range Site Work
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Emergencies: <br />6.27 In emergencies affecting the safety or protection of persons or the Work or property at the <br />site or adjacent thereto, CONTRACTOR, without special instruction or authorization €rom <br />ENGINEER or OWNER, is obligated to act to prevent threatened damage, injury or toss <br />CONTRACTOR shall give ENGINEER prompt written notice that any significant changes <br />in the Work or variations from the Contract Documents have been caused thereby. If <br />ENGINEER determines that a change in the Contract Documents is required because of <br />the action taken in response to an emergency, a Work Directive Change or Change Order <br />will be issued to document the consequences of the changes or variations. <br />Shap Drawings and Samples:. <br />6.26 After checking and verifying all field measurements and after complying with applicable <br />procedures specified in the General Requirements, CONTRACTOR shall submit to <br />ENGINEER for rek%iew in accordance with the accepted schedule of Shop Drawing <br />submissions (see paragraph 2.9), or for other appropriate action if so indicated in the <br />Supplementary Conditions, five (6) copies (unless otherwise specified in the General <br />Requirements) of all Shop Drawings, which will bear a stamp or specific written indication <br />that CONTRACTOR has satisfied CONT'RACTOR's responsibilities under the Contract <br />Documents with respect to the review of the submission. All submissions will be identified <br />as ENGINEER may require. The data shown on the Shop Drawings will be complete with <br />r ", Ct to quantities, dimensions, speed performance and design criteria, materials and <br />similar data to enable ENGINEER to review the information as required. <br />6.29 CONTRACTOR shall also submit to ENGINEER for review with such promptness as to <br />muse no delay in Work, all samples requirod by the Contract Documents. All samples will <br />have been chocked by and accompanied by a specific written indication that <br />CONTRACTOR has satisfied CONTRACTOR's responsibilities under the Contract <br />Documents with respect to the review of the submission and will be identified clearly as to <br />material, Supplier, pei 4inent data such as catalog numbers and the use for which intended. <br />6.30 Before submission of each Shop Drawing or sample CONTRACTOR shall have <br />determined and verified all quantities, dimensions, specified performance criteria, <br />installation requirements, materials, catalog numbers and similar data with respect thereto <br />and reviewed or coordinated each Shop Drawing or sample with other Shop Drawings and <br />samples and with the requirements of the Work and the Contract Documents. <br />6.31 At the time of each submission, CONTRACTOR shall give ENGINEER specific written <br />notice of each variation that the Shop Drawings or samples may have from the <br />requirements of the Contract Documents, and in addition, shall cause a specific notation <br />iu be maeie on each Snop urawing stinmittod to EM31NFER for review of each such <br />variation. <br />6.32 ENGINEER will review with reasonable promptness Shop drawings and samples, but <br />ENGINEER's review will be only for conformance with the design concept of the Project <br />and for compliance with the information given in the Contract Documents and shall not <br />extend to means, methods, techniques, sequences or procedures of construction (except <br />where a specific means, methods, technique, sequence or procedure of construction is <br />indicated in or required by the Contract Documents) or to safety precautions or programs <br />incident thereto. The review of a separate item as such will not indicate review of the <br />assembly in which the item functions. CONTRACTOR shall snake corrections required by <br />ENGINEER, and shall return the required number of corrected copies of Shop Drawings <br />GENERAL CONDI'T'IONS � <br />GC - 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.