My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-245
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-245
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 3:30:34 PM
Creation date
11/16/2023 3:22:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/21/1999
Control Number
1999-245
Entity Name
Sheltra & Son Construction
Subject
Contract and Bid Award for Shooting Range Site Work
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
+! <br />and submit as required new samples for review. CONTRACTOR shall direct specific <br />attention in writing to revisions other than the corrections called for by ENGINEER on <br />t previous submittals. <br />6.33 ENGINEER's review of Shop Drawings or samples shall not relieve CONTRACTOR from <br />responsibility for any variation from the requirements of the Contract Documents unless <br />CONTRACTOR has in writing called ENGINEER's attention to each such variation at the <br />time of submission as required by paragraph 6.31 and ENGINEER has given written <br />review each such variation by a specific written notation thereof incorporated in or <br />accompanying the Shop thawing or sample review nor will any review by ENGINEER <br />relieve CONTRACTOR from responsibility for errors or omissions in the Shop Drawings <br />or from responsibility for having complied with the provisions of paragraph 6,30. <br />6,34 Where a Shap Drawing or sample is required by the Specifications, any related Work <br />performed prior to ENGINEER's review of the pertinent submission vrill be the sole <br />expense and responsibility of CONTRACTOR. <br />Continuing the Work: <br />6.35 CONTRACTOR shall carry on the Work and adhere to the progress schedule during all <br />disputes or disagreements with OWNER. No Work shall be delayed or postponed pending <br />rosokrtion of any disputes or disagreements, except as permitted by paragraph 15.5 or as <br />CONTRACTOR and OWNER may otherwise agree in writing. <br />Indemnification: <br />6.36 The CONTRACTOR shall hold harmless, indemnify and defend the OWNER, the <br />OWNER's Representative, the ENGINEER, and their consultants, and each of their <br />officers, employees and agents harmless from all costs, losses, expanses, damages, <br />attorneys' fees, and other costs, including all costs of defense, which any of them may <br />incur v,40) respect to tate failure, neglect, or refusal of CONTRACTOR to faithfully perform <br />the work and all of the CONTRACTOR's obligations under the contract. Such costs, <br />expenses, and damages shall include all cost incurred by the OWNER, the OWNER's <br />Representative, the ENGINEER, and their consultants to defend against any claims, stop <br />notices, or lawsuits based thereon in which any of them is made a party. <br />6.38 In any and all claims against OWNER or ENGINEER or any of their consultants, agents <br />or employees by any employee of CONTRACTOR, any Subcontractor, any person or <br />organization directly or indirectly employed by any of them to perform or furnish any of the <br />Work or any one for whose acts any of them may be liable, the indemnification obligation <br />under paragraphs 6.36 and 6.37 shall not be limited in any way by any limitation on the <br />aii-4i,ui t ut lyra, of Liu'nages, compensation or benefits payable by or for CONTRACTOR <br />or any such Subcontractor or other person or organization under worker's or workmen's <br />compensation acts, disability benefit acts or other employee benefit acts. <br />6.38 The obligations of CONTRACTOR under paragraphs 6.36 and 6.37 shall not extend to the <br />liability of ENGINEER, ENGINEER's consultants, agents or employees arising out of the <br />preparation or approval of maps, drawings, opinions, reports, surveys, Change Orders, <br />designs or specifications. <br />Interpretation of Contract Documents: <br />6,40.1 It Is the duty of the CONTRACTOR to notify the ENGINEER, in writing, in the event of any <br />GFINFRAL CONDITIONS <br />SGC - 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.